WELLSVILLE VOR

Federal Excess

Allegany, New York · SPP

DC Readiness
51.8
Fair / 100

WELLSVILLE VOR is a federal excess datacenter candidate site in Allegany, New York, interconnecting through SPP. It screens at 51.8/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

UtilityNIAGARA MOHAWK POWER CORP.investor ownedmoderate to large load · terms ≥ 20 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth35
Avg queue wait3.3 yrs

Connectivity

Nearest IXPVictory Technology Center
IXP distance65.9 mi
Fiber providers5
Fiber coverage71.3%

Site characteristics

Acreage37 ac
Buildable load (est.)~1537 MWland-based
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterLandmax Data Systems, Inc
DC distance65.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.31¢/kWh
Industrial electricity6.68¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$3,316

Regulatory climate

Restrictivestate posture · as of 2026-08

First statewide moratorium (2026): 1-yr hold on certain permits for large DCs + impact study.

DC tax incentiveNo / suspended
Large-load threshold≥ 50 MW

Moratorium/permit hold targets large datacenters.

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track WELLSVILLE VOR

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
90
Natural hazard6%
65
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
44
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Allegany, ranked by DC Readiness.

Sites near WELLSVILLE VOR
SiteTypeVoltageCapacityQueue waitScore
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs55.2
UNKNOWN124588Substation-Adjacent115 kV100 MW4.9 yrs55.2
UNKNOWN124587Substation-Adjacent115 kV100 MW4.9 yrs55.1
EC Near Hyland LFGTE FacilityGreenfield3.5 yrs55.1
UNKNOWN124581Substation-Adjacent115 kV100 MW4.9 yrs55.1
Hyland LFGTE FacilityBrownfield2 MW3.5 yrs54.5
UNKNOWN124589Substation-Adjacent115 kV100 MW4.9 yrs54.3
TAP140650Substation-Adjacent115 kV100 MW4.9 yrs54.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WELLSVILLE VOR, Allegany. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.