Datacenter Sites in Eureka, Nevada

Eureka has 28 scored datacenter candidate sites averaging 46.0/100 DC Readiness, with a catalogued aggregate of 1,021 MW. FEMA rates local natural-hazard risk as "Very Low". The county has a datacenter tax incentive on record.

At a glance

Eureka, Nevada has 28 scored datacenter candidate sites averaging 46.0/100 DC Readiness, roughly in line with the Nevada average of 48.5. It ranks 15th of 17 Nevada counties by number of sites and 12th by average score. The top-scoring site is FALCON at 55.5/100.

28
Candidate sites
46.0/100
Avg DC Readiness
1,021 MW
Catalogued capacity
theoretical aggregate
Very Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Eureka

Site-selection context for Eureka

Yessales_tax_abatement
Datacenter tax incentive
7.44¢/kWh
Commercial electricity
5.85¢/kWh
Industrial electricity
0
Fiber providers
Extremely High
Water stress
$577
Land price / acre
2,000
Cooling degree days
3,700
Heating degree days
50°F
Mean annual temp

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

How does Eureka compare with other counties in Nevada?

By number of scored sites, Eureka ranks 15th of the 17 Nevada counties with a county page, holding 1.5% of the state's 1,809 sites. Its average DC Readiness of 46.0/100 ranks 12th in the state and is about 13% below the national average of 53.0. Nationally it has the 1344th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 1 score 55 or higher.

What types of datacenter sites are in Eureka?

Greenfield sites are the most common (13, 46% of the county's inventory), followed by former mine (11) and substation-adjacent (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Eureka?

Industrial electricity averages 5.85¢/kWh and commercial 7.44¢/kWh. FEMA's National Risk Index rates the county "Very Low" (12). WRI water stress is extremely high. 0 fiber providers report service in the county. The climate runs 2,000 cooling degree days a year with a mean temperature of 50°F. Land is valued around $577 an acre.

By site type

Top datacenter sites in Eureka

Top datacenter sites in Eureka
SiteTypeVoltageCapacityQueue waitScore
FALCONSubstation-Adjacent345 kV600 MW3.5 yrs55.5
EC Near TS Power PlantGreenfield——3.5 yrs52.9
EC Near TS Power PlantGreenfield——3.5 yrs52.1
EC Near TS Power PlantGreenfield——3.5 yrs51.7
EC Near TS Power PlantGreenfield——3.5 yrs51.7
EC Near TS Power PlantGreenfield——3.5 yrs51.2
T.S. POWERSubstation-Adjacent120 kV100 MW3.5 yrs51.0
EC Near TS Power PlantGreenfield——3.5 yrs49.8
MACHACEKSubstation-Adjacent230 kV300 MW3.5 yrs49.2
BeowaweBrownfield120 kV21 MW3.5 yrs46.9
EC FFE Eureka CountyGreenfield——3.5 yrs46.6
EC Near TS Power PlantGreenfield——3.5 yrs46.6
EC Near TS Power PlantGreenfield——3.5 yrs46.5
EC Near TS Power PlantGreenfield——3.5 yrs46.0
EC Near TS Power PlantGreenfield——3.5 yrs45.5
EC Near TS Power PlantGreenfield——3.5 yrs44.8
Mine SiteFormer Mine——3.5 yrs43.8
Mine SiteFormer Mine——3.5 yrs43.7
EC Near TS Power PlantGreenfield——3.5 yrs43.5
Mine SiteFormer Mine——3.5 yrs43.3
Mine SiteFormer Mine——3.5 yrs42.8
Mine SiteFormer Mine——3.5 yrs42.7
Mine SiteFormer Mine——3.5 yrs40.9
Mine SiteFormer Mine——3.5 yrs40.3
Mine SiteFormer Mine——3.5 yrs40.2

Every scored site in Eureka

All 28 sites, best first.

Eureka datacenter FAQ

How many datacenter sites are in Eureka?

28 scored datacenter candidate sites, averaging 46.0/100 DC Readiness. That is the 15th-most of 17 Nevada counties with five or more sites.

What is the highest-scoring datacenter site in Eureka?

FALCON scores 55.5/100 DC Readiness, the highest of the 28 scored sites in Eureka (a substation-adjacent site).

Does Eureka offer datacenter tax incentives?

Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

What is the natural-hazard risk in Eureka?

FEMA's National Risk Index rates Eureka as "Very Low" (score 12).

What are industrial electricity rates in Eureka?

Average industrial electricity is 5.85¢/kWh and commercial is 7.44¢/kWh in Eureka.

More in Nevada

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Eureka, Nevada”, https://gridcensus.com/datacenter-sites/nevada/eureka (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Eureka, Nevada is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.