Skip to content
Gridcensus

Mine Site

Former Mine

Eureka, Nevada · WECC

DC Readiness
41.5
Fair / 100

Mine Site is a former mine datacenter candidate site in Eureka, Nevada, interconnecting through WECC. It screens at 41.5/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

UtilityMT WHEELER POWER, INCcooperative

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth53
Avg queue wait6.9 yrs

Connectivity

Fiber providers0
Fiber coverage0.0%

Site characteristics

Site typeFormer Mine
Former useMining: Metal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score88/100

Location context

County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity7.44¢/kWh
Industrial electricity5.85¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$577

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
58
Fiber connectivity12%
21
Energy cost10%
50
Water risk7%
10
Natural hazard6%
88
Buildability7%
50
Labor market4%
50
DC cluster4%
10
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in Eureka, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
FALCONSubstation-Adjacent345 kV600 MW6.9 yrs56.7
EC Near TS Power PlantGreenfield——5.8 yrs52.7
EC Near TS Power PlantGreenfield——5.8 yrs51.9
T.S. POWERSubstation-Adjacent120 kV100 MW6.9 yrs51.7
EC Near TS Power PlantGreenfield——5.8 yrs51.5
EC Near TS Power PlantGreenfield——5.8 yrs51.5
EC Near TS Power PlantGreenfield——5.8 yrs51.0
MACHACEKSubstation-Adjacent230 kV300 MW6.9 yrs50.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Eureka. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.