EC Near TS Power Plant
GreenfieldEureka, Nevada · WECC
EC Near TS Power Plant is a greenfield datacenter candidate site in Eureka, Nevada, interconnecting through WECC. It screens at 38.7/100 DC Readiness and a 5.8 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Eureka, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| T.S. POWER | Substation-Adjacent | 120 kV | 100 MW | 5.8 yrs | 57.7 |
| Greenfield (ROBINSON - FALCON) | Greenfield | 345 kV | 600 MW | 5.8 yrs | 57.0 |
| TS Power Plant | Brownfield | — | 168 MW | — | 56.0 |
| Greenfield (ROBINSON - FALCON) | Greenfield | 345 kV | 600 MW | 5.8 yrs | 55.9 |
| Greenfield (ROBINSON - FALCON) | Greenfield | 345 kV | 600 MW | 5.8 yrs | 55.7 |
| Greenfield (ROBINSON - FALCON) | Greenfield | 345 kV | 600 MW | 5.8 yrs | 55.5 |
| MACHACEK | Substation-Adjacent | 230 kV | 300 MW | 5.8 yrs | 55.4 |
| Greenfield (ROBINSON - FALCON) | Greenfield | 345 kV | 600 MW | 5.8 yrs | 54.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.