Beowawe

Brownfield

Eureka, Nevada · WECC

DC Readiness
46.8
Fair / 100

Beowawe is a brownfield datacenter candidate site in Eureka, Nevada, interconnecting through WECC. It screens at 46.8/100 DC Readiness with a catalogued 21 MW of candidate capacity and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationT.S. POWER
Substation distance14.1 mi
Substation voltage120 kV
Available capacity21 MW
Utility commercial rate0.07¢/kWh
UtilitySIERRA PACIFIC POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWClean Transition Tariff (large loads)

Speed to power

Interconnection outlookConstrained
≈ 5.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth53
Avg queue wait5.8 yrs
Recent queue wait5.8 yrs
Completion rate10%
Withdrawal rate90%

Connectivity

Fiber providers0
Fiber coverage0.0%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance248.1 mi

Site characteristics

Site typeBrownfield
Parcel ownerOrmat Nevada Inc
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity
Former usegeothermal
Existing capacity21 MW
Retirement date2024-05-01

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)4.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score88/100
Construction cost index101.1 (avg 100)

Location context

Nearest rail7.7 mi
Nearest gas pipeline2.0 mi
Nearest fiber route174.9 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity7.44¢/kWh
Industrial electricity5.85¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$577

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Beowawe

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
7
Speed to power20%
43
Fiber connectivity12%
45
Energy cost10%
95
Water risk7%
10
Natural hazard6%
88
Buildability7%
95
Labor market4%
50
DC cluster4%
10
Land / acreage3%
63
Construction cost3%
66
Gas pipeline2%
94
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in Eureka, ranked by DC Readiness.

Sites near Beowawe
SiteTypeVoltageCapacityQueue waitScore
FALCONSubstation-Adjacent345 kV600 MW6.9 yrs56.7
EC Near TS Power PlantGreenfield——5.8 yrs52.7
EC Near TS Power PlantGreenfield——5.8 yrs51.9
T.S. POWERSubstation-Adjacent120 kV100 MW6.9 yrs51.7
EC Near TS Power PlantGreenfield——5.8 yrs51.5
EC Near TS Power PlantGreenfield——5.8 yrs51.5
EC Near TS Power PlantGreenfield——5.8 yrs51.0
MACHACEKSubstation-Adjacent230 kV300 MW6.9 yrs50.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Beowawe, Eureka. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.