Datacenter Sites in St. Francois, Missouri
St. Francois has 43 scored datacenter candidate sites averaging 53.9/100 DC Readiness, with a catalogued aggregate of 3,712 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
43
Candidate sites
53.9/100
Avg DC Readiness
3,712 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for St. Francois
Yessales_tax_exemption
Datacenter tax incentive
11.29¢/kWh
Commercial electricity
7.20¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$5,052
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp
Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.
By site type
Top datacenter sites in St. Francois
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| ST FRANCOIS | Substation-Adjacent | 345 kV | 600 MW | 4.6 yrs | 66.4 |
| UNKNOWN117859 | Substation-Adjacent | 138 kV | 100 MW | 4.6 yrs | 65.1 |
| UNKNOWN121834 | Substation-Adjacent | 138 kV | 100 MW | 4.6 yrs | 64.5 |
| TAP139472 | Substation-Adjacent | 138 kV | 100 MW | 4.6 yrs | 64.3 |
| Greenfield (LUTESVILLE - ST FRANCOIS) | Greenfield | 345 kV | 600 MW | 4.6 yrs | 64.0 |
| Greenfield (LUTESVILLE - ST FRANCOIS) | Greenfield | 345 kV | 600 MW | 4.6 yrs | 63.6 |
| RIVERMINE | Substation-Adjacent | 138 kV | 100 MW | 4.6 yrs | 62.8 |
| UNKNOWN117773 | Substation-Adjacent | 161 kV | 100 MW | 4.6 yrs | 62.0 |
| Greenfield (RUSH ISLAND - ST FRANCOIS) | Greenfield | 345 kV | 600 MW | 4.6 yrs | 61.7 |
| TAP153231 | Substation-Adjacent | 138 kV | 100 MW | 4.6 yrs | 60.6 |
| Greenfield (UNKNOWN117893 - TAP139482) | Greenfield | 138 kV | 100 MW | 4.6 yrs | 60.2 |
| Greenfield (UNKNOWN117893 - ST FRANCOIS) | Greenfield | 138 kV | 100 MW | 4.6 yrs | 59.1 |
| Greenfield (RIVERMINE - TAP139471) | Greenfield | 138 kV | 100 MW | 4.6 yrs | 59.0 |
| EC Near Walton Street Substation | Greenfield | — | — | 1.4 yrs | 58.9 |
| EC Near Walton Street Substation | Greenfield | — | — | 1.4 yrs | 58.7 |
| Greenfield (TAP139430 - ST FRANCOIS) | Greenfield | 138 kV | 100 MW | 4.6 yrs | 58.2 |
| Greenfield (TAUM SAUK - RIVERMINE) | Greenfield | 138 kV | 100 MW | 4.6 yrs | 58.0 |
| EC Near Walton Street Substation | Greenfield | — | — | 1.4 yrs | 57.6 |
| EC Near Walton Street Substation | Greenfield | — | — | 1.4 yrs | 56.8 |
| Jefferson Street Substation | Brownfield | — | 6 MW | 1.4 yrs | 56.2 |
| Walton Street Substation | Brownfield | — | 4 MW | 1.4 yrs | 56.0 |
| EC Near Walton Street Substation | Greenfield | — | — | 1.4 yrs | 55.8 |
| EC Near Walton Street Substation | Greenfield | — | — | 1.4 yrs | 55.7 |
| Greenfield (UNKNOWN117899 - ST FRANCOIS) | Greenfield | 138 kV | 100 MW | 4.6 yrs | 55.6 |
| Greenfield (RIVERMINE - UNKNOWN121747) | Greenfield | 138 kV | 100 MW | 4.6 yrs | 55.6 |
St. Francois datacenter FAQ
- How many datacenter sites are in St. Francois?
- 43 scored datacenter candidate sites, averaging 53.9/100 DC Readiness.
- Does St. Francois offer datacenter tax incentives?
- Qualified data center sales tax exemption (2019 law); state income tax credits.
- What is the natural-hazard risk in St. Francois?
- FEMA's National Risk Index rates St. Francois as "Relatively High" (score 38).
- What are industrial electricity rates in St. Francois?
- Average industrial electricity is 7.20¢/kWh and commercial is 11.29¢/kWh in St. Francois.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for St. Francois, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.