Datacenter Sites in St. Francois, Missouri

St. Francois has 43 scored datacenter candidate sites averaging 53.9/100 DC Readiness, with a catalogued aggregate of 3,712 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

43
Candidate sites
53.9/100
Avg DC Readiness
3,712 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for St. Francois

Yessales_tax_exemption
Datacenter tax incentive
11.29¢/kWh
Commercial electricity
7.20¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$5,052
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

By site type

Top datacenter sites in St. Francois

Top datacenter sites in St. Francois
SiteTypeVoltageCapacityQueue waitScore
ST FRANCOISSubstation-Adjacent345 kV600 MW4.6 yrs66.4
UNKNOWN117859Substation-Adjacent138 kV100 MW4.6 yrs65.1
UNKNOWN121834Substation-Adjacent138 kV100 MW4.6 yrs64.5
TAP139472Substation-Adjacent138 kV100 MW4.6 yrs64.3
Greenfield (LUTESVILLE - ST FRANCOIS)Greenfield345 kV600 MW4.6 yrs64.0
Greenfield (LUTESVILLE - ST FRANCOIS)Greenfield345 kV600 MW4.6 yrs63.6
RIVERMINESubstation-Adjacent138 kV100 MW4.6 yrs62.8
UNKNOWN117773Substation-Adjacent161 kV100 MW4.6 yrs62.0
Greenfield (RUSH ISLAND - ST FRANCOIS)Greenfield345 kV600 MW4.6 yrs61.7
TAP153231Substation-Adjacent138 kV100 MW4.6 yrs60.6
Greenfield (UNKNOWN117893 - TAP139482)Greenfield138 kV100 MW4.6 yrs60.2
Greenfield (UNKNOWN117893 - ST FRANCOIS)Greenfield138 kV100 MW4.6 yrs59.1
Greenfield (RIVERMINE - TAP139471)Greenfield138 kV100 MW4.6 yrs59.0
EC Near Walton Street SubstationGreenfield1.4 yrs58.9
EC Near Walton Street SubstationGreenfield1.4 yrs58.7
Greenfield (TAP139430 - ST FRANCOIS)Greenfield138 kV100 MW4.6 yrs58.2
Greenfield (TAUM SAUK - RIVERMINE)Greenfield138 kV100 MW4.6 yrs58.0
EC Near Walton Street SubstationGreenfield1.4 yrs57.6
EC Near Walton Street SubstationGreenfield1.4 yrs56.8
Jefferson Street SubstationBrownfield6 MW1.4 yrs56.2
Walton Street SubstationBrownfield4 MW1.4 yrs56.0
EC Near Walton Street SubstationGreenfield1.4 yrs55.8
EC Near Walton Street SubstationGreenfield1.4 yrs55.7
Greenfield (UNKNOWN117899 - ST FRANCOIS)Greenfield138 kV100 MW4.6 yrs55.6
Greenfield (RIVERMINE - UNKNOWN121747)Greenfield138 kV100 MW4.6 yrs55.6

St. Francois datacenter FAQ

How many datacenter sites are in St. Francois?
43 scored datacenter candidate sites, averaging 53.9/100 DC Readiness.
Does St. Francois offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in St. Francois?
FEMA's National Risk Index rates St. Francois as "Relatively High" (score 38).
What are industrial electricity rates in St. Francois?
Average industrial electricity is 7.20¢/kWh and commercial is 11.29¢/kWh in St. Francois.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for St. Francois, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.