Datacenter Sites in St. Francois, Missouri

St. Francois has 30 scored datacenter candidate sites averaging 52.2/100 DC Readiness, with a catalogued aggregate of 912 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

30
Candidate sites
52.2/100
Avg DC Readiness
912 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in St. Francois

Site-selection context for St. Francois

Yessales_tax_exemption
Datacenter tax incentive
11.29¢/kWh
Commercial electricity
7.20¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$5,052
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

By site type

Top datacenter sites in St. Francois

Top datacenter sites in St. Francois
SiteTypeVoltageCapacityQueue waitScore
ST FRANCOISSubstation-Adjacent345 kV600 MW2.8 yrs60.5
EC Near Walton Street SubstationGreenfield——1.4 yrs57.8
EC Near Walton Street SubstationGreenfield——1.4 yrs57.5
EC Near Walton Street SubstationGreenfield——1.4 yrs56.8
EC Near Walton Street SubstationGreenfield——1.4 yrs55.6
EC Near Walton Street SubstationGreenfield——1.4 yrs55.2
EC Near Walton Street SubstationGreenfield——1.4 yrs55.1
RIVERMINESubstation-Adjacent138 kV100 MW2.8 yrs55.1
TAP139472Substation-Adjacent138 kV100 MW2.8 yrs55.1
TAP153230Substation-Adjacent138 kV100 MW2.8 yrs55.0
EC Near Walton Street SubstationGreenfield——1.4 yrs54.6
EC Near Walton Street SubstationGreenfield——1.4 yrs54.1
Jefferson Street SubstationBrownfield—6 MW1.4 yrs53.7
Walton Street SubstationBrownfield—4 MW1.4 yrs53.5
EC Near Elm Street Substation GeneratorsGreenfield——1.4 yrs53.2
EC Near Walton Street SubstationGreenfield——1.4 yrs53.1
EC Near Walton Street SubstationGreenfield——1.4 yrs51.9
Elm Street Substation GeneratorsBrownfield—2 MW1.4 yrs49.2
CscIndustrial——2.8 yrs48.8
12.5 acre IDA siteIndustrial——2.8 yrs48.8
BttexIndustrial——2.8 yrs48.8
BtipIndustrial——2.8 yrs48.8
MarmcIndustrial——2.8 yrs48.8
Mine SiteFormer Mine——2.8 yrs48.7
Former Waste Lagoon SiteIndustrial——2.8 yrs48.6

St. Francois datacenter FAQ

How many datacenter sites are in St. Francois?
30 scored datacenter candidate sites, averaging 52.2/100 DC Readiness.
Does St. Francois offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in St. Francois?
FEMA's National Risk Index rates St. Francois as "Relatively High" (score 38).
What are industrial electricity rates in St. Francois?
Average industrial electricity is 7.20¢/kWh and commercial is 11.29¢/kWh in St. Francois.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen