Datacenter Sites in St. Francois, Missouri

St. Francois has 30 scored datacenter candidate sites averaging 52.4/100 DC Readiness, with a catalogued aggregate of 912 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

St. Francois, Missouri has 30 scored datacenter candidate sites averaging 52.4/100 DC Readiness, roughly in line with the Missouri average of 55.7. It ranks 18th of 110 Missouri counties by number of sites and 92nd by average score. The top-scoring site is ST FRANCOIS at 61.2/100.

30
Candidate sites
52.4/100
Avg DC Readiness
912 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in St. Francois

Site-selection context for St. Francois

Yessales_tax_exemption
Datacenter tax incentive
11.29¢/kWh
Commercial electricity
7.20¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$5,052
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

How does St. Francois compare with other counties in Missouri?

By number of scored sites, St. Francois ranks 18th of the 110 Missouri counties with a county page, holding 0.9% of the state's 3,413 sites. Its average DC Readiness of 52.4/100 ranks 92nd in the state and is roughly in line with the national average of 53.0. Nationally it has the 1271st-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 8 score 55 or higher.

What types of datacenter sites are in St. Francois?

Greenfield sites are the most common (11, 37% of the county's inventory), followed by industrial (7) and substation-adjacent (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in St. Francois?

Industrial electricity averages 7.20¢/kWh and commercial 11.29¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,500 cooling degree days a year with a mean temperature of 56°F. Land is valued around $5,052 an acre.

By site type

Top datacenter sites in St. Francois

Top datacenter sites in St. Francois
SiteTypeVoltageCapacityQueue waitScore
ST FRANCOISSubstation-Adjacent345 kV600 MW4.3 yrs61.2
EC Near Walton Street SubstationGreenfield——4.3 yrs57.2
EC Near Walton Street SubstationGreenfield——4.3 yrs56.9
EC Near Walton Street SubstationGreenfield——4.3 yrs56.2
RIVERMINESubstation-Adjacent138 kV100 MW4.3 yrs55.8
TAP139472Substation-Adjacent138 kV100 MW4.3 yrs55.8
TAP153230Substation-Adjacent138 kV100 MW4.3 yrs55.6
EC Near Walton Street SubstationGreenfield——4.3 yrs55.0
EC Near Walton Street SubstationGreenfield——4.3 yrs54.6
EC Near Walton Street SubstationGreenfield——4.3 yrs54.5
EC Near Walton Street SubstationGreenfield——4.3 yrs54.0
EC Near Walton Street SubstationGreenfield——4.3 yrs53.5
Jefferson Street SubstationBrownfield—6 MW4.3 yrs53.4
Walton Street SubstationBrownfield—4 MW4.3 yrs53.2
EC Near Elm Street Substation GeneratorsGreenfield——4.3 yrs52.6
EC Near Walton Street SubstationGreenfield——4.3 yrs52.5
EC Near Walton Street SubstationGreenfield——4.3 yrs51.3
MarmcIndustrial——4.3 yrs49.5
12.5 acre IDA siteIndustrial——4.3 yrs49.5
BttexIndustrial——4.3 yrs49.5
BtipIndustrial——4.3 yrs49.5
CscIndustrial——4.3 yrs49.5
Mine SiteFormer Mine——4.3 yrs49.4
Mine SiteFormer Mine——4.3 yrs49.2
Former Waste Lagoon SiteIndustrial——4.3 yrs49.2

Every scored site in St. Francois

All 30 sites, best first.

St. Francois datacenter FAQ

How many datacenter sites are in St. Francois?

30 scored datacenter candidate sites, averaging 52.4/100 DC Readiness. That is the 18th-most of 110 Missouri counties with five or more sites.

What is the highest-scoring datacenter site in St. Francois?

ST FRANCOIS scores 61.2/100 DC Readiness, the highest of the 30 scored sites in St. Francois (a substation-adjacent site).

Does St. Francois offer datacenter tax incentives?

Qualified data center sales tax exemption (2019 law); state income tax credits.

What is the natural-hazard risk in St. Francois?

FEMA's National Risk Index rates St. Francois as "Relatively High" (score 38).

What are industrial electricity rates in St. Francois?

Average industrial electricity is 7.20¢/kWh and commercial is 11.29¢/kWh in St. Francois.

More in Missouri

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in St. Francois, Missouri”, https://gridcensus.com/datacenter-sites/missouri/st-francois (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for St. Francois, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.