Former Waste Lagoon Site

Industrial

St. Francois, Missouri · MISO

DC Readiness
42.3
Fair / 100

Former Waste Lagoon Site is a industrial datacenter candidate site in St. Francois, Missouri, interconnecting through MISO. It screens at 42.3/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth34

Connectivity

Nearest IXPCogent St Louis
IXP distance49.1 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterGenome Data Center
DC distance49.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.29¢/kWh
Industrial electricity7.20¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$5,052

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
52
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in St. Francois, ranked by DC Readiness.

Sites near Former Waste Lagoon Site
SiteTypeVoltageCapacityQueue waitScore
ST FRANCOISSubstation-Adjacent345 kV600 MW4.6 yrs66.4
UNKNOWN117859Substation-Adjacent138 kV100 MW4.6 yrs65.1
UNKNOWN121834Substation-Adjacent138 kV100 MW4.6 yrs64.5
TAP139472Substation-Adjacent138 kV100 MW4.6 yrs64.3
Greenfield (LUTESVILLE - ST FRANCOIS)Greenfield345 kV600 MW4.6 yrs64.0
Greenfield (LUTESVILLE - ST FRANCOIS)Greenfield345 kV600 MW4.6 yrs63.6
RIVERMINESubstation-Adjacent138 kV100 MW4.6 yrs62.8
UNKNOWN117773Substation-Adjacent161 kV100 MW4.6 yrs62.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Former Waste Lagoon Site, St. Francois. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.