Datacenter Sites in Scott, Missouri

Scott has 25 scored datacenter candidate sites averaging 54.1/100 DC Readiness, with a catalogued aggregate of 1,450 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

At a glance

Scott, Missouri has 25 scored datacenter candidate sites averaging 54.1/100 DC Readiness, roughly in line with the Missouri average of 55.7. It ranks 33rd of 110 Missouri counties by number of sites and 60th by average score. The top-scoring site is KELSO at 61.5/100.

25
Candidate sites
54.1/100
Avg DC Readiness
1,450 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Scott

Site-selection context for Scott

Yessales_tax_exemption
Datacenter tax incentive
12.39¢/kWh
Commercial electricity
7.44¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$6,405
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

How does Scott compare with other counties in Missouri?

By number of scored sites, Scott ranks 33rd of the 110 Missouri counties with a county page, holding 0.7% of the state's 3,413 sites. Its average DC Readiness of 54.1/100 ranks 60th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1462nd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 13 score 55 or higher.

What types of datacenter sites are in Scott?

Greenfield sites are the most common (10, 40% of the county's inventory), followed by substation-adjacent (10) and industrial (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Scott?

Industrial electricity averages 7.44¢/kWh and commercial 12.39¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (38). WRI water stress is low. 2 fiber providers report service in the county. The climate runs 1,500 cooling degree days a year with a mean temperature of 56°F. Land is valued around $6,405 an acre.

By site type

Top datacenter sites in Scott

Top datacenter sites in Scott
SiteTypeVoltageCapacityQueue waitScore
KELSOSubstation-Adjacent345 kV600 MW4.3 yrs61.5
EC Near ColemanGreenfield——4.3 yrs58.3
UNKNOWN117159Substation-Adjacent161 kV100 MW4.3 yrs56.3
EC Near ColemanGreenfield——4.3 yrs56.3
EC Near ColemanGreenfield——4.3 yrs56.3
TAP168486Substation-Adjacent161 kV100 MW4.3 yrs56.2
SOUTHWESTSubstation-Adjacent161 kV100 MW4.3 yrs56.2
UNKNOWN121696Substation-Adjacent161 kV100 MW4.3 yrs56.1
EC Near ColemanGreenfield——4.3 yrs56.1
UNKNOWN121697Substation-Adjacent161 kV100 MW4.3 yrs56.1
UNKNOWN117849Substation-Adjacent161 kV100 MW4.3 yrs56.1
EC Near ColemanGreenfield——4.3 yrs55.3
EC Near ColemanGreenfield——4.3 yrs55.1
EC Near ColemanGreenfield——4.3 yrs54.8
EC Near ColemanGreenfield——4.3 yrs54.1
UNKNOWN168426Substation-Adjacent69 kV50 MW4.3 yrs53.3
TAP168425Substation-Adjacent69 kV50 MW4.3 yrs53.3
UNKNOWN122399Substation-Adjacent69 kV50 MW4.3 yrs53.2
EC Near ColemanGreenfield——4.3 yrs50.4
Scott City Parking Lot, Scott CityIndustrial——4.3 yrs49.5
Mission MissouriIndustrial——4.3 yrs49.5
Waters Gas Station (former)Industrial——4.3 yrs49.5
Mine SiteFormer Mine——4.3 yrs49.4
Greenfield (UNKNOWN117806 - TAP153751)Greenfield161 kV100 MW4.3 yrs49.4
JonesboroFederal Excess——4.3 yrs49.0

Every scored site in Scott

All 25 sites, best first.

Scott datacenter FAQ

How many datacenter sites are in Scott?

25 scored datacenter candidate sites, averaging 54.1/100 DC Readiness. That is the 33rd-most of 110 Missouri counties with five or more sites.

What is the highest-scoring datacenter site in Scott?

KELSO scores 61.5/100 DC Readiness, the highest of the 25 scored sites in Scott (a substation-adjacent site).

Does Scott offer datacenter tax incentives?

Qualified data center sales tax exemption (2019 law); state income tax credits.

What is the natural-hazard risk in Scott?

FEMA's National Risk Index rates Scott as "Relatively High" (score 38).

What are industrial electricity rates in Scott?

Average industrial electricity is 7.44¢/kWh and commercial is 12.39¢/kWh in Scott.

More in Missouri

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Scott, Missouri”, https://gridcensus.com/datacenter-sites/missouri/scott (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Scott, Missouri is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.