Datacenter Sites in Scott, Missouri

Scott has 25 scored datacenter candidate sites averaging 53.8/100 DC Readiness, with a catalogued aggregate of 1,450 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

25
Candidate sites
53.8/100
Avg DC Readiness
1,450 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Scott

Site-selection context for Scott

Yessales_tax_exemption
Datacenter tax incentive
12.39¢/kWh
Commercial electricity
7.44¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$6,405
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

By site type

Top datacenter sites in Scott

Top datacenter sites in Scott
SiteTypeVoltageCapacityQueue waitScore
KELSOSubstation-Adjacent345 kV600 MW2.8 yrs60.8
EC Near ColemanGreenfield1.4 yrs58.9
EC Near ColemanGreenfield1.4 yrs56.9
EC Near ColemanGreenfield1.4 yrs56.9
EC Near ColemanGreenfield1.4 yrs56.7
UNKNOWN117159Substation-Adjacent161 kV100 MW2.8 yrs55.9
EC Near ColemanGreenfield1.4 yrs55.9
EC Near ColemanGreenfield1.4 yrs55.7
SOUTHWESTSubstation-Adjacent161 kV100 MW2.8 yrs55.5
UNKNOWN121696Substation-Adjacent161 kV100 MW2.8 yrs55.5
TAP168486Substation-Adjacent161 kV100 MW2.8 yrs55.5
UNKNOWN117849Substation-Adjacent161 kV100 MW2.8 yrs55.5
EC Near ColemanGreenfield1.4 yrs55.4
UNKNOWN121697Substation-Adjacent161 kV100 MW2.8 yrs55.4
EC Near ColemanGreenfield1.4 yrs54.7
UNKNOWN168426Substation-Adjacent69 kV50 MW2.8 yrs52.6
UNKNOWN122399Substation-Adjacent69 kV50 MW2.8 yrs52.6
TAP168425Substation-Adjacent69 kV50 MW2.8 yrs52.6
EC Near ColemanGreenfield1.4 yrs51.0
Mission MissouriIndustrial2.8 yrs48.8
Waters Gas Station (former)Industrial2.8 yrs48.8
Scott City Parking Lot, Scott CityIndustrial2.8 yrs48.8
Mine SiteFormer Mine2.8 yrs48.7
Greenfield (UNKNOWN117806 - TAP153751)Greenfield161 kV100 MW2.8 yrs48.7
JonesboroFederal Excess3.8 yrs46.8

Scott datacenter FAQ

How many datacenter sites are in Scott?
25 scored datacenter candidate sites, averaging 53.8/100 DC Readiness.
Does Scott offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Scott?
FEMA's National Risk Index rates Scott as "Relatively High" (score 38).
What are industrial electricity rates in Scott?
Average industrial electricity is 7.44¢/kWh and commercial is 12.39¢/kWh in Scott.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Scott, Missouri. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.