UNKNOWN117849

Substation-Adjacent

Scott, Missouri · MISO

DC Readiness
55.5
Good / 100

UNKNOWN117849 is a substation-adjacent datacenter candidate site in Scott, Missouri, interconnecting through MISO. It screens at 55.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN117849
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait2.8 yrs

Connectivity

Nearest IXPQuad State Internet METRO1 Colocation
IXP distance46.8 mi
Fiber providers2
Fiber coverage38.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterQuad State Internet METRO1 Colocation
DC distance46.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.39¢/kWh
Industrial electricity7.44¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$6,405

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN117849

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
45
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Scott, ranked by DC Readiness.

Sites near UNKNOWN117849
SiteTypeVoltageCapacityQueue waitScore
KELSOSubstation-Adjacent345 kV600 MW2.8 yrs60.8
EC Near ColemanGreenfield1.4 yrs58.9
EC Near ColemanGreenfield1.4 yrs56.9
EC Near ColemanGreenfield1.4 yrs56.9
EC Near ColemanGreenfield1.4 yrs56.7
UNKNOWN117159Substation-Adjacent161 kV100 MW2.8 yrs55.9
EC Near ColemanGreenfield1.4 yrs55.9
EC Near ColemanGreenfield1.4 yrs55.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.