Skip to content
Gridcensus

Datacenter Sites in Pulaski County, Missouri

Pulaski County has 22 scored datacenter candidate sites averaging 51.3/100 DC Readiness, with a catalogued aggregate of 1,250 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

22
Candidate sites
51.3/100
Avg DC Readiness
1,250 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 22 in Pulaski County

Site-selection context for Pulaski County

Yessales_tax_exemption
Datacenter tax incentive
11.30¢/kWh
Commercial electricity
8.68¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,020
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

By site type

Top datacenter sites in Pulaski County

Top datacenter sites in Pulaski County
SiteTypeVoltageCapacityQueue waitScore
FRANKSSubstation-Adjacent345 kV600 MW2.8 yrs60.1
OZ PulaskiGreenfield——1.4 yrs58.5
OZ PulaskiGreenfield——1.4 yrs55.3
UNKNOWN117817Substation-Adjacent161 kV100 MW2.8 yrs54.7
UNKNOWN117771Substation-Adjacent161 kV100 MW2.8 yrs54.5
UNKNOWN121795Substation-Adjacent161 kV100 MW2.8 yrs54.1
UNKNOWN117883Substation-Adjacent69 kV50 MW2.8 yrs52.5
UNKNOWN121797Substation-Adjacent69 kV50 MW2.8 yrs51.8
TAP153227Substation-Adjacent69 kV50 MW2.8 yrs51.8
UNKNOWN117748Substation-Adjacent69 kV50 MW2.8 yrs51.8
UNKNOWN121796Substation-Adjacent69 kV50 MW2.8 yrs51.8
UNKNOWN121798Substation-Adjacent69 kV50 MW2.8 yrs51.7
UNKNOWN121799Substation-Adjacent69 kV50 MW2.8 yrs51.7
H.D. Lee Building (former), Richland Area Wide AssIndustrial——2.8 yrs47.9
Mine SiteFormer Mine——2.8 yrs47.9
Mine SiteFormer Mine——2.8 yrs47.8
Tri-County WoodcraftIndustrial——2.8 yrs47.8
Mine SiteFormer Mine——2.8 yrs47.7
Mine SiteFormer Mine——2.8 yrs47.6
Mine SiteFormer Mine——2.8 yrs47.6
Mine SiteFormer Mine——2.8 yrs47.3
CROCKER MISSOURIFederal Excess——3.8 yrs46.5

Pulaski County datacenter FAQ

How many datacenter sites are in Pulaski County?
22 scored datacenter candidate sites, averaging 51.3/100 DC Readiness.
Does Pulaski County offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Pulaski County?
FEMA's National Risk Index rates Pulaski County as "Relatively High" (score 38).
What are industrial electricity rates in Pulaski County?
Average industrial electricity is 8.68¢/kWh and commercial is 11.30¢/kWh in Pulaski County.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Pulaski County, Missouri. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.