CROCKER MISSOURI

Federal Excess

Pulaski County, Missouri · PJM

DC Readiness
46.5
Fair / 100

CROCKER MISSOURI is a federal excess datacenter candidate site in Pulaski County, Missouri, interconnecting through PJM. It screens at 46.5/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityGASCOSAGE ELECTRIC COOPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPBluebird Underground Data Center
IXP distance69.2 mi
Fiber providers4
Fiber coverage30.1%

Site characteristics

Acreage173 ac
Buildable load (est.)~69–173 MWland-based
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterCarfax
DC distance66.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.30¢/kWh
Industrial electricity8.68¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$3,020

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track CROCKER MISSOURI

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
38
Fiber connectivity12%
56
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
63
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Pulaski County, ranked by DC Readiness.

Sites near CROCKER MISSOURI
SiteTypeVoltageCapacityQueue waitScore
FRANKSSubstation-Adjacent345 kV600 MW2.8 yrs60.1
OZ PulaskiGreenfield——1.4 yrs58.5
OZ PulaskiGreenfield——1.4 yrs55.3
UNKNOWN117817Substation-Adjacent161 kV100 MW2.8 yrs54.7
UNKNOWN117771Substation-Adjacent161 kV100 MW2.8 yrs54.5
UNKNOWN121795Substation-Adjacent161 kV100 MW2.8 yrs54.1
UNKNOWN117883Substation-Adjacent69 kV50 MW2.8 yrs52.5
UNKNOWN117748Substation-Adjacent69 kV50 MW2.8 yrs51.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CROCKER MISSOURI, Pulaski County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.