Skip to content
Gridcensus

Datacenter Sites in Dunklin, Missouri

Dunklin has 29 scored datacenter candidate sites averaging 55.1/100 DC Readiness, with a catalogued aggregate of 200 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

29
Candidate sites
55.1/100
Avg DC Readiness
200 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Dunklin

Site-selection context for Dunklin

Yessales_tax_exemption
Datacenter tax incentive
10.35¢/kWh
Commercial electricity
7.88¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$6,938
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

By site type

Top datacenter sites in Dunklin

Top datacenter sites in Dunklin
SiteTypeVoltageCapacityQueue waitScore
EC Near MaldenGreenfield——1.4 yrs59.3
EC Near MaldenGreenfield——1.4 yrs59.2
EC Near MaldenGreenfield——1.4 yrs58.9
EC Near MaldenGreenfield——1.4 yrs57.1
EC Near KennettGreenfield——1.4 yrs57.0
EC Near MaldenGreenfield——1.4 yrs56.9
EC Near MaldenGreenfield——1.4 yrs56.9
EC Near MaldenGreenfield——1.4 yrs56.8
EC Near MaldenGreenfield——1.4 yrs56.8
EC Near MaldenGreenfield——1.4 yrs56.7
EC Near MaldenGreenfield——1.4 yrs56.7
EC Near KennettGreenfield——1.4 yrs56.6
EC Near KennettGreenfield——1.4 yrs56.4
EC Near KennettGreenfield——1.4 yrs56.4
EC Near KennettGreenfield——1.4 yrs56.4
EC Near KennettGreenfield——1.4 yrs56.3
EC Near MaldenGreenfield——1.4 yrs56.3
EC Near KennettGreenfield——1.4 yrs55.9
EC Near KennettGreenfield——1.4 yrs55.3
OZ DunklinGreenfield——1.4 yrs55.3
UNKNOWN117809Substation-Adjacent161 kV100 MW2.8 yrs55.1
UNKNOWN168479Substation-Adjacent69 kV50 MW2.8 yrs52.7
UNKNOWN117151Substation-Adjacent69 kV50 MW2.8 yrs52.6
EC Near KennettGreenfield——1.4 yrs52.2
EC Near KennettGreenfield——1.4 yrs51.3

Dunklin datacenter FAQ

How many datacenter sites are in Dunklin?
29 scored datacenter candidate sites, averaging 55.1/100 DC Readiness.
Does Dunklin offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Dunklin?
FEMA's National Risk Index rates Dunklin as "Relatively High" (score 38).
What are industrial electricity rates in Dunklin?
Average industrial electricity is 7.88¢/kWh and commercial is 10.35¢/kWh in Dunklin.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Dunklin, Missouri. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.