Skip to content
Gridcensus

Datacenter Sites in Daviess, Missouri

Daviess has 20 scored datacenter candidate sites averaging 56.6/100 DC Readiness, with a catalogued aggregate of 404 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

20
Candidate sites
56.6/100
Avg DC Readiness
404 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 21 in Daviess

Site-selection context for Daviess

Yessales_tax_exemption
Datacenter tax incentive
10.34¢/kWh
Commercial electricity
7.23¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$4,517
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

By site type

Top datacenter sites in Daviess

Top datacenter sites in Daviess
SiteTypeVoltageCapacityQueue waitScore
EC Near Gallatin #2Greenfield1.4 yrs60.8
EC Near Gallatin #2Greenfield1.4 yrs60.4
EC Near Gallatin #2Greenfield1.4 yrs59.8
EC Near Gallatin #2Greenfield1.4 yrs59.7
EC Near Gallatin #2Greenfield1.4 yrs59.2
EC Near Gallatin #2Greenfield1.4 yrs58.5
EC Near Gallatin #2Greenfield1.4 yrs58.4
EC Near Gallatin #2Greenfield1.4 yrs58.4
Gallatin #2Brownfield4 MW1.4 yrs58.3
EC Near Gallatin #2Greenfield1.4 yrs58.1
EC Near Gallatin #2Greenfield1.4 yrs57.8
EC Near Gallatin #2Greenfield1.4 yrs57.7
EC Near Gallatin #2Greenfield1.4 yrs55.8
UNKNOWN120024Substation-Adjacent69 kV50 MW2.8 yrs52.6
Mine SiteFormer Mine2.8 yrs51.9
Mine SiteFormer Mine2.8 yrs51.9
Mine SiteFormer Mine2.8 yrs51.8
UNKNOWN118652Substation-Adjacent69 kV50 MW2.8 yrs51.8
UNKNOWN118653Substation-Adjacent69 kV50 MW2.8 yrs51.8
UNKNOWN118654Substation-Adjacent69 kV50 MW2.8 yrs51.8
UNKNOWN117506Substation-Adjacent69 kV50 MW2.8 yrs51.8

Daviess datacenter FAQ

How many datacenter sites are in Daviess?
20 scored datacenter candidate sites, averaging 56.6/100 DC Readiness.
Does Daviess offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Daviess?
FEMA's National Risk Index rates Daviess as "Relatively High" (score 38).
What are industrial electricity rates in Daviess?
Average industrial electricity is 7.23¢/kWh and commercial is 10.34¢/kWh in Daviess.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Daviess, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.