EC Near Gallatin #2

Greenfield

Daviess, Missouri · MISO

DC Readiness
59.7
Good / 100

EC Near Gallatin #2 is a greenfield datacenter candidate site in Daviess, Missouri, interconnecting through MISO. It screens at 59.7/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth39
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLincoln Rackhouse Kansas City
IXP distance54.7 mi
Fiber providers5
Fiber coverage60.2%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance132.2 mi

Site characteristics

Site typeGreenfield
Land contactDaviess County Assessor
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay
Former usenear retired oil plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index96.0 (avg 100)

Location context

Nearest datacenterCenturyLink
DC distance13.1 mi
Nearest rail14.4 mi
Nearest gas pipeline23.4 mi
Nearest fiber route63.7 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.34¢/kWh
Industrial electricity7.23¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,517

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
55
Fiber connectivity12%
57
Energy cost10%
89
Water risk8%
88
Natural hazard8%
62
Buildability7%
75
Labor market4%
50
DC cluster4%
85
Land / acreage3%
48
Construction cost3%
70
Gas pipeline2%
25
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Daviess, ranked by DC Readiness.

Sites near EC Near Gallatin #2
SiteTypeVoltageCapacityQueue waitScore
EC Near Gallatin #2Greenfield1.4 yrs60.8
EC Near Gallatin #2Greenfield1.4 yrs60.4
EC Near Gallatin #2Greenfield1.4 yrs59.8
EC Near Gallatin #2Greenfield1.4 yrs59.2
EC Near Gallatin #2Greenfield1.4 yrs58.5
EC Near Gallatin #2Greenfield1.4 yrs58.4
EC Near Gallatin #2Greenfield1.4 yrs58.4
Gallatin #2Brownfield4 MW1.4 yrs58.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.