Datacenter Sites in Michigan
Michigan has 5,157 scored datacenter candidate sites averaging 55.3/100 DC Readiness. Industrial parcels lead the inventory (3,253 sites). Most sites interconnect through MISO. The state's candidate sites carry a catalogued aggregate of 128.2k MW and average a 2.2 yrs interconnection-queue wait.
At a glance
Michigan has 5,157 scored datacenter candidate sites, the 8th-most of the 50 states, DC and Puerto Rico, averaging 55.3/100 DC Readiness against a national average of 53.0. Its average score ranks 15th among states. The state also has 23 operating datacenters and 23 internet exchange facilities on record.
How does Michigan compare with other states for datacenter sites?
By number of scored candidate sites, Michigan ranks 8th of the 50 states, DC and Puerto Rico (5,157 of 147,272 nationally, 3.5%). Its average DC Readiness of 55.3/100 ranks 15th and is roughly in line with the national average of 53.0. The average interconnection-queue wait at its sites, 2.2-year, is the 3rd-shortest of the group (national 4.2-year).
Across the five headline sub-scores, Michigan is strongest relative to the nation on water (93.3 vs 72.3 nationally) and weakest on power availability (34.3 vs 37.4). Power and speed to power carry 20% of the score each, fiber 12%, water 7% and hazard 6%.
Which counties in Michigan have the most datacenter sites?
Wayne County (569 sites, average 57.9), Oakland County (354 sites, average 57.2), and Kent County (242 sites, average 57.7) hold the largest inventories. Together the top 3 account for 23% of the state's scored sites. Cass County has the highest average score among counties with at least 10 sites (59.7/100). 81 counties have five or more scored sites and their own county page.
What kinds of sites and grid regions are in Michigan?
Industrial parcels are the largest category (3,253, 63%), followed by substation-adjacent (768) and greenfield (719). Sites span 2 grid regions; MISO covers 94% of them.
By site type
Average sub-score profile
How Michigan's candidate sites score on each DC Readiness dimension (0–100 average).
Top 25 datacenter sites in Michigan
Ranked by DC Readiness.
| Site | Type | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|
| WAYNE | Substation-Adjacent | Wayne County | 345 kV | 600 MW | 2.2 yrs | 69.6 |
| UNKNOWN128399 | Substation-Adjacent | Macomb County | 345 kV | 600 MW | 2.2 yrs | 69.3 |
| WEEDS LAKE | Substation-Adjacent | Kalamazoo County | 345 kV | 600 MW | 2.2 yrs | 69.0 |
| GAINES | Substation-Adjacent | Kent County | 345 kV | 600 MW | 2.2 yrs | 69.0 |
| ST. CLAIR | Substation-Adjacent | St. Clair County | 345 kV | 600 MW | 2.2 yrs | 68.6 |
| UNKNOWN128466 | Substation-Adjacent | Macomb County | 345 kV | 600 MW | 2.2 yrs | 68.6 |
| ONEIDA | Substation-Adjacent | Eaton County | 345 kV | 600 MW | 2.2 yrs | 68.6 |
| SENECA | Substation-Adjacent | Macomb County | 345 kV | 600 MW | 2.2 yrs | 68.4 |
| ARGENTA | Substation-Adjacent | Kalamazoo County | 345 kV | 600 MW | 2.2 yrs | 68.4 |
| MILAN | Substation-Adjacent | Washtenaw County | 345 kV | 600 MW | 2.2 yrs | 68.3 |
| TALLMADGE | Substation-Adjacent | Kent County | 345 kV | 600 MW | 2.2 yrs | 68.3 |
| WIXOM | Substation-Adjacent | Oakland County | 345 kV | 600 MW | 2.2 yrs | 68.2 |
| UNKNOWN128507 | Substation-Adjacent | Oakland County | 345 kV | 600 MW | 2.2 yrs | 68.1 |
| Conners Creek | Brownfield | Wayne County | — | 275 MW | 2.2 yrs | 68.1 |
| COVENTRY | Substation-Adjacent | Washtenaw County | 345 kV | 600 MW | 2.2 yrs | 68.0 |
| KENZIE CREEK | Substation-Adjacent | Cass County | 345 kV | 600 MW | 2.2 yrs | 68.0 |
| UNKNOWN128451 | Substation-Adjacent | Wayne County | 230 kV | 300 MW | 2.2 yrs | 67.8 |
| ROOSEVELT | Substation-Adjacent | Ottawa County | 345 kV | 600 MW | 2.2 yrs | 67.8 |
| UNKNOWN128512 | Substation-Adjacent | Macomb County | 345 kV | 600 MW | 2.2 yrs | 67.7 |
| BROWNSTOWN | Substation-Adjacent | Wayne County | 345 kV | 600 MW | 2.2 yrs | 67.6 |
| DEADEND167215 | Substation-Adjacent | Macomb County | 345 kV | 600 MW | 2.2 yrs | 67.5 |
| UNKNOWN128514 | Substation-Adjacent | Macomb County | 345 kV | 600 MW | 2.2 yrs | 67.4 |
| COOK | Substation-Adjacent | Berrien County | 765 kV | 1,000 MW | 2.2 yrs | 67.4 |
| KARN | Substation-Adjacent | Bay County | 345 kV | 600 MW | 2.2 yrs | 67.1 |
| VERGENNES | Substation-Adjacent | Kent County | 345 kV | 600 MW | 2.2 yrs | 67.1 |
Counties in Michigan
81 counties with five or more scored sites.
Sites in Michigan counties with fewer than five sites
7 scored sites sit in counties too small for a county page of their own.
- OZ Gogebic · Gogebic · 59.8
- OZ Oceana · Oceana · 59.3
- DONALDSON CREEK · Oceana County · 58.9
- EC FFE Oceana County · Oceana County · 52.2
- EC FFE Gogebic County · Gogebic County · 51.5
- Mine Site · Gogebic County · 50.6
- Mine Site · Gogebic County · 50.6
Operating datacenters in Michigan
23 operating datacenter facilities in Michigan are on record, the 28th-most of any state. Southfield has the largest cluster (4 facilities). The operators with the most facilities here are ManagedWay Company (3), Verizon Wireless (1), Midwest Energy & Communications (1). Footprints are recorded for 8 of them, totalling about 0.3 million square feet.
Southfield (4)
- EdgeConneX Detroit DET01 · EdgeConneX
- 123.NET - DC1 - 24700 Northwestern Hwy. · 123.Net, LLC.
- 365 Data Centers Detroit (DT1) · 365 Data Centers
- ManagedWay SFJ2 · ManagedWay Company
Detroit (3)
- Quicken Loans DC · Quicken Loans
- Verizon Wireless DC · Verizon Wireless
- Raeden Michigan 1 · Raeden
Lansing (2)
- Liquid Web, Inc
- Liquid Web · CMN-RUS, Inc. d/b/a Metronet
Ann Arbor (1)
- Synergy Fiber · SYNERGY BROADBAND
Byron Center (1)
- ManagedWay BYK1 · ManagedWay Company
Cassopolics (1)
- Midwest Energy & Communications · Midwest Energy & Communications
Flint (1)
Houghton (1)
- MI Tech - Main Campus · Michigan Technological University
Kalamazoo (1)
- Aunalytics Kalamazoo Datacenter · Aunalytics
Royal Oak (1)
- Liberty Center One · Liberty Center One
Southgate (1)
- Comcast · Comcast
Troy (1)
- ManagedWay TYM1 · ManagedWay Company
Westland (1)
- Otava Metro Detroit · Otava LLC
City not recorded (4)
- US Signal DC · US Signal
- Chick-fil-A Hiring Center · Dennis Sampier
- Datacenter 11815482844
- Datacenter 1510420026
Internet exchange and peering facilities in Michigan
23 peering and colocation facilities in Michigan are listed in PeeringDB. Southfield has the most (9). The best-connected facility hosts 55 networks; the median facility in the state hosts 2 networks.
Southfield (9)
- 123.NET - DC1 - 24700 Northwestern Hwy. · 55 networks
- EdgeConneX Detroit (EDCDET01) · 13 networks
- 365 Data Centers Detroit (DT1) · 9 networks
- 123.NET - DC2 - 24275 Northwestern Hwy. · 6 networks
- 123.NET - DC3 - 24245 Northwestern Hwy. · 6 networks
- EDCDET01 · 2 networks
- ManagedWay SFJ1 · 2 networks
- ManagedWay SFJ2 · 2 networks
- Subrigo DET11 · 1 networks
Byron Center (3)
- 123.NET - DC4 - 400 76th St SW · 11 networks
- ManagedWay BYK1 · 2 networks
- US Signal - Grand Rapids South · 2 networks
Detroit (2)
- Cogent Detroit · 3 networks
- Raeden Michigan 1 · 0 networks
Troy (2)
- ManagedWay TYM1 · 7 networks
- ManagedWay TYM2 · 4 networks
Ann Arbor (1)
- Synergy Fiber · 0 networks
Cassopolics (1)
- Midwest Energy & Communications · 0 networks
Houghton (1)
- MI Tech - Main Campus · 2 networks
Kalamazoo (1)
- Aunalytics Kalamazoo Datacenter · 1 networks
Lansing (1)
- Liquid Web DC3 · 1 networks
Royal Oak (1)
- Liberty Center One · 4 networks
Westland (1)
- Otava Metro Detroit · 1 networks
Michigan datacenter site selection FAQ
How many datacenter sites are in Michigan?
GridCensus catalogs 5,157 scored datacenter candidate sites in Michigan, with an average DC Readiness score of 55.3/100. That is the 8th-largest inventory of the 50 states, DC and Puerto Rico.
How many operating datacenters are in Michigan?
23 operating datacenter facilities in Michigan are on record, the 28th-most of any state. Southfield has the most (4). ManagedWay Company operates the most facilities in the state (3).
What is the average interconnection-queue wait in Michigan?
Candidate sites in Michigan average a 2.2-year interconnection-queue wait, with an average queue depth of 262 projects. The national average across all scored sites is 4.2-year, and Michigan has the 3rd-shortest average wait of the 50 states, DC and Puerto Rico.
Which county in Michigan has the most datacenter sites?
Wayne County has the most scored candidate sites in Michigan (569), followed by Oakland County (354) and Kent County (242). Among counties with at least 10 sites, Cass County has the highest average DC Readiness (59.7/100).
What kind of datacenter sites are most common in Michigan?
Industrial sites are the most common category in Michigan (3,253 sites, 63% of the inventory), and most sites fall within the MISO grid region.
How many internet exchange facilities are in Michigan?
23 peering and colocation facilities listed in PeeringDB are in Michigan. Southfield has the most (9). The best-connected one hosts 55 networks.
Looking for a specific record? The directory lists every scored datacenter site in Michigan, A to Z.
More Michigan infrastructure
- Electric substations in Michigan
- Brownfield and retired power plant sites in Michigan
- MISO grid region· 4,857 sites here
- PJM grid region· 300 sites here
- Industrial sites in Michigan· 3,253
- Substation-Adjacent sites in Michigan· 768
- Greenfield sites in Michigan· 719
- Former Mine sites in Michigan· 304
- States ranked by datacenter readiness
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Michigan”, https://gridcensus.com/datacenter-sites/michigan (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.