Synergy Fiber
Internet ExchangeAnn Arbor, MI · SYNERGY BROADBAND
At a glance
Synergy Fiber is a colocation and interconnection facility listed in PeeringDB, located at 3131 S State St, Suit 306, Ann Arbor, MI 48108. It is operated by SYNERGY BROADBAND. PeeringDB lists no networks present at Synergy Fiber.
Peering & carrier density
Location
How many networks and carriers are at Synergy Fiber?
PeeringDB lists no networks present at Synergy Fiber.
Who operates Synergy Fiber?
PeeringDB lists SYNERGY BROADBAND as the operator of Synergy Fiber. This is the only US facility listed for SYNERGY BROADBAND in the catalog.
Where is Synergy Fiber located?
The facility's address is 3131 S State St, Suit 306, Ann Arbor, MI 48108. It is the only PeeringDB interconnection facility catalogued in Ann Arbor. Michigan has 23 of the 1,390 US facilities; the best-connected has 55 networks present.
What datacenters and sites are near Synergy Fiber?
5 datacenters are listed in the surrounding area (the largest by footprint); of those, the closest is Synergy Fiber, operated by SYNERGY BROADBAND, about 0.0 miles away. The highest-scoring datacenter candidate site in the surrounding area is WAYNE in Wayne County, with a DC Readiness score of 69.6 out of 100.
Nearby datacenters
- EdgeConneX Detroit DET01EdgeConneX · Southfield, MI
- US Signal DCUS Signal · MI
- 123.NET - DC1 - 24700 Northwestern Hwy.123.Net, LLC. · Southfield, MI
- Synergy FiberSYNERGY BROADBAND · Ann Arbor, MI
- Otava Metro DetroitOtava LLC · Westland, MI
Nearby datacenter candidate sites
Scored candidate sites near Synergy Fiber, ranked by DC Readiness. Co-location near a well-peered exchange is a meaningful fiber-connectivity advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WAYNE | Substation-Adjacent | MI | Wayne County | 345 kV | 600 MW | 2.2 yrs | 69.6 |
| MILAN | Substation-Adjacent | MI | Washtenaw County | 345 kV | 600 MW | 2.2 yrs | 68.3 |
| WIXOM | Substation-Adjacent | MI | Oakland County | 345 kV | 600 MW | 2.2 yrs | 68.2 |
| COVENTRY | Substation-Adjacent | MI | Washtenaw County | 345 kV | 600 MW | 2.2 yrs | 68.0 |
| DEADEND167207 | Substation-Adjacent | MI | Monroe County | 345 kV | 600 MW | 2.2 yrs | 67.0 |
| MAJESTIC | Substation-Adjacent | MI | Washtenaw County | 345 kV | 600 MW | 2.2 yrs | 66.7 |
| TAP137284 | Substation-Adjacent | MI | Monroe County | 345 kV | 600 MW | 2.2 yrs | 66.2 |
| UNKNOWN128355 | Substation-Adjacent | MI | Monroe County | 345 kV | 600 MW | 2.2 yrs | 66.0 |
Frequently asked questions
Who owns or operates Synergy Fiber?
Synergy Fiber is operated by SYNERGY BROADBAND, according to its PeeringDB facility record.
What is the address of Synergy Fiber?
Synergy Fiber is at 3131 S State St, Suit 306, Ann Arbor, MI 48108. Coordinates: 42.2418, -83.7376.
How many networks and carriers are at Synergy Fiber?
PeeringDB lists no networks present at Synergy Fiber. PeeringDB counts every network (carriers, ISPs, cloud and content networks) that lists the facility as a point of presence.
Is there an internet exchange at Synergy Fiber?
PeeringDB records no internet exchange fabric at Synergy Fiber.
Which datacenters are near Synergy Fiber?
Large datacenters catalogued near Synergy Fiber include Synergy Fiber (SYNERGY BROADBAND), 0.0 miles away; US Signal DC (US Signal), 15 miles away; Otava Metro Detroit (Otava LLC), 17 miles away.
More interconnection facilities and hubs in Michigan
About this data
Source: PeeringDB facility records, as published March 6, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Synergy Fiber, Ann Arbor, MI”, https://gridcensus.com/internet-exchanges/synergy-fiber-8eebffed (data as of March 6, 2026).
Dataset updated . Screening estimates derived from public data sources.
Network and exchange counts are point-in-time figures from PeeringDB and may lag changes at the facility.
Go deeper than the public screen
Every site and score for Synergy Fiber, Ann Arbor, MI is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.