Skip to content
Gridcensus

Datacenter Sites in Huron, Michigan

Huron has 76 scored datacenter candidate sites averaging 56.1/100 DC Readiness, with a catalogued aggregate of 7,425 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

76
Candidate sites
56.1/100
Avg DC Readiness
7,425 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Huron

Site-selection context for Huron

Yesproperty_tax_exemption
Datacenter tax incentive
8.81¢/kWh
Commercial electricity
4.74¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$7,652
Land price / acre
700
Cooling degree days
6,600
Heating degree days
45°F
Mean annual temp

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

By site type

Top datacenter sites in Huron

Top datacenter sites in Huron
SiteTypeVoltageCapacityQueue waitScore
Harbor BeachBrownfield120 kV125 MW2.8 yrs63.4
EC Coal Huron CountyGreenfield2.2 yrs59.8
RAPSONSubstation-Adjacent345 kV600 MW3.8 yrs59.3
UNKNOWN145627Substation-Adjacent345 kV600 MW3.8 yrs59.3
EC Near Harbor BeachGreenfield2.2 yrs58.7
EC Near Pine StreetGreenfield2.2 yrs58.1
EC Near Harbor BeachGreenfield2.2 yrs57.1
EC Near Pine StreetGreenfield2.2 yrs57.0
EC Near Harbor BeachGreenfield2.2 yrs56.8
EC Near Harbor BeachGreenfield2.2 yrs56.5
EC Near Harbor BeachGreenfield2.2 yrs56.3
EC Coal Huron CountyGreenfield2.2 yrs56.2
EC Near Pine StreetGreenfield2.2 yrs55.9
UNKNOWN131033Substation-Adjacent120 kV100 MW3.8 yrs53.2
UNKNOWN128372Substation-Adjacent120 kV100 MW3.8 yrs53.2
UNKNOWN144569Substation-Adjacent120 kV100 MW3.8 yrs53.2
UNKNOWN128840Substation-Adjacent120 kV100 MW3.8 yrs53.2
TAP144568Substation-Adjacent120 kV100 MW3.8 yrs53.2
TAP145626Substation-Adjacent120 kV100 MW3.8 yrs53.2
UNKNOWN128838Substation-Adjacent120 kV100 MW3.8 yrs53.2
UNKNOWN128837Substation-Adjacent120 kV100 MW3.8 yrs53.2
EC Near Pine StreetGreenfield2.2 yrs52.9
EC Coal Huron CountyGreenfield2.2 yrs52.8
EC Near Pine StreetGreenfield2.2 yrs52.8
EC Near Pine StreetGreenfield2.2 yrs52.7

Huron datacenter FAQ

How many datacenter sites are in Huron?
76 scored datacenter candidate sites, averaging 56.1/100 DC Readiness.
Does Huron offer datacenter tax incentives?
Personal property tax exemption for eligible DC equipment; MEGA tax credits.
What is the natural-hazard risk in Huron?
FEMA's National Risk Index rates Huron as "Relatively Moderate" (score 25).
What are industrial electricity rates in Huron?
Average industrial electricity is 4.74¢/kWh and commercial is 8.81¢/kWh in Huron.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Huron, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.