Otsego has 27 scored datacenter candidate sites averaging 56.5/100 DC Readiness, with a catalogued aggregate of 1,700 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Otsego, Michigan has 27 scored datacenter candidate sites averaging 56.5/100 DC Readiness, roughly in line with the Michigan average of 55.3. It ranks 51st of 81 Michigan counties by number of sites and 14th by average score. The top-scoring site is LIVINGSTON at 64.6/100.

27
Candidate sites
56.5/100
Avg DC Readiness
1,700 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Otsego

Site-selection context for Otsego

Yesproperty_tax_exemption
Datacenter tax incentive
12.19¢/kWh
Commercial electricity
7.79¢/kWh
Industrial electricity
9
Fiber providers
Low
Water stress
$3,545
Land price / acre
700
Cooling degree days
6,600
Heating degree days
45°F
Mean annual temp

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

How does Otsego compare with other counties in Michigan?

By number of scored sites, Otsego ranks 51st of the 81 Michigan counties with a county page, holding 0.5% of the state's 5,157 sites. Its average DC Readiness of 56.5/100 ranks 14th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1383rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 20 score 55 or higher.

What types of datacenter sites are in Otsego?

Substation-Adjacent sites are the most common (12, 44% of the county's inventory), followed by greenfield (11) and former mine (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Otsego?

Industrial electricity averages 7.79¢/kWh and commercial 12.19¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (25). WRI water stress is low. 9 fiber providers report service in the county. The climate runs 700 cooling degree days a year with a mean temperature of 45°F. Land is valued around $3,545 an acre.

By site type

Top datacenter sites in Otsego

Top datacenter sites in Otsego
SiteTypeVoltageCapacityQueue waitScore
LIVINGSTONSubstation-Adjacent345 kV600 MW2.2 yrs64.6
EC Near Gaylord - ConsumersGreenfield——2.2 yrs59.4
EC Near Gaylord - ConsumersGreenfield——2.2 yrs59.2
UNKNOWN128920Substation-Adjacent138 kV100 MW2.2 yrs59.1
UNKNOWN133923Substation-Adjacent138 kV100 MW2.2 yrs58.9
UNKNOWN128921Substation-Adjacent138 kV100 MW2.2 yrs58.9
UNKNOWN143794Substation-Adjacent138 kV100 MW2.2 yrs58.9
VAN TYLESubstation-Adjacent138 kV100 MW2.2 yrs58.6
UNKNOWN128880Substation-Adjacent138 kV100 MW2.2 yrs58.4
TAP143808Substation-Adjacent138 kV100 MW2.2 yrs58.3
EC Near Gaylord - ConsumersGreenfield——2.2 yrs58.2
EC Near Gaylord - ConsumersGreenfield——2.2 yrs57.4
EC Near Gaylord - ConsumersGreenfield——2.2 yrs57.3
EC Near Gaylord - ConsumersGreenfield——2.2 yrs56.8
EC Near Gaylord - ConsumersGreenfield——2.2 yrs56.8
EC Near Gaylord - ConsumersGreenfield——2.2 yrs56.6
UNKNOWN133166Substation-Adjacent69 kV50 MW2.2 yrs56.4
TAP171287Substation-Adjacent69 kV50 MW2.2 yrs56.2
UNKNOWN156630Substation-Adjacent69 kV50 MW2.2 yrs55.4
TAP171286Substation-Adjacent69 kV50 MW2.2 yrs55.3
GAYLORD MICHIGANFederal Excess——2.2 yrs52.7
Mine SiteFormer Mine——2.2 yrs52.4
Greenfield (UNKNOWN128880 - LIVINGSTON)Greenfield138 kV100 MW2.2 yrs52.4
Mine SiteFormer Mine——2.2 yrs52.4
Greenfield (UNKNOWN128860 - LIVINGSTON)Greenfield138 kV100 MW2.2 yrs52.0

Every scored site in Otsego

All 27 sites, best first.

Otsego datacenter FAQ

How many datacenter sites are in Otsego?

27 scored datacenter candidate sites, averaging 56.5/100 DC Readiness. That is the 51st-most of 81 Michigan counties with five or more sites.

What is the highest-scoring datacenter site in Otsego?

LIVINGSTON scores 64.6/100 DC Readiness, the highest of the 27 scored sites in Otsego (a substation-adjacent site).

Does Otsego offer datacenter tax incentives?

Personal property tax exemption for eligible DC equipment; MEGA tax credits.

What is the natural-hazard risk in Otsego?

FEMA's National Risk Index rates Otsego as "Relatively Moderate" (score 25).

What are industrial electricity rates in Otsego?

Average industrial electricity is 7.79¢/kWh and commercial is 12.19¢/kWh in Otsego.

More in Michigan

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Otsego, Michigan”, https://gridcensus.com/datacenter-sites/michigan/otsego (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Otsego, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.