Datacenter Sites in Shiawassee County, Michigan
Shiawassee County has 19 scored datacenter candidate sites averaging 56.4/100 DC Readiness, with a catalogued aggregate of 1,300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
At a glance
Shiawassee County, Michigan has 19 scored datacenter candidate sites averaging 56.4/100 DC Readiness, roughly in line with the Michigan average of 55.3. It ranks 59th of 81 Michigan counties by number of sites and 15th by average score. The top-scoring site is GOSS at 66.5/100.
Site-selection context for Shiawassee County
Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.
How does Shiawassee County compare with other counties in Michigan?
By number of scored sites, Shiawassee County ranks 59th of the 81 Michigan counties with a county page, holding 0.4% of the state's 5,157 sites. Its average DC Readiness of 56.4/100 ranks 15th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1783rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 7 score 55 or higher.
What types of datacenter sites are in Shiawassee County?
Former Mine sites are the most common (7, 37% of the county's inventory), followed by substation-adjacent (6) and greenfield (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Shiawassee County?
Industrial electricity averages 4.59¢/kWh and commercial 8.96¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (25). WRI water stress is low. 9 fiber providers report service in the county. The climate runs 700 cooling degree days a year with a mean temperature of 45°F. Land is valued around $6,037 an acre.
By site type
Top datacenter sites in Shiawassee County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| GOSS | Substation-Adjacent | 345 kV | 600 MW | 2.2 yrs | 66.5 |
| TAP145816 | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 60.5 |
| UNKNOWN128557 | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 60.2 |
| UNKNOWN128564 | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 60.0 |
| UNKNOWN128560 | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 60.0 |
| UNKNOWN128565 | Substation-Adjacent | 138 kV | 100 MW | 2.2 yrs | 59.9 |
| EC FFE Shiawassee County | Greenfield | — | — | 2.2 yrs | 55.8 |
| Greenfield (UNKNOWN128557 - TAP139918) | Greenfield | 138 kV | 100 MW | 2.2 yrs | 54.7 |
| Durand Property | Industrial | — | — | 2.2 yrs | 54.5 |
| Mine Site | Former Mine | — | — | 2.2 yrs | 54.4 |
| Mine Site | Former Mine | — | — | 2.2 yrs | 54.4 |
| Mine Site | Former Mine | — | — | 2.2 yrs | 54.3 |
| Mine Site | Former Mine | — | — | 2.2 yrs | 54.2 |
| Laingsburg | Industrial | — | — | 2.2 yrs | 54.2 |
| Greenfield (UNKNOWN131565 - TAP145816) | Greenfield | 138 kV | 100 MW | 2.2 yrs | 54.0 |
| Mine Site | Former Mine | — | — | 2.2 yrs | 53.9 |
| Former Redmond Co | Industrial | — | — | 2.2 yrs | 53.7 |
| Mine Site | Former Mine | — | — | 2.2 yrs | 53.7 |
| Mine Site | Former Mine | — | — | 2.2 yrs | 53.2 |
Every scored site in Shiawassee County
All 19 sites, best first.
- GOSS · 66.5
- Substation-Adjacent site · 296851a5 · 60.5
- Substation-Adjacent site · b89b688f · 60.2
- Substation-Adjacent site · e3446f50 · 60.0
- Substation-Adjacent site · c5692da3 · 60.0
- Substation-Adjacent site · d6908109 · 59.9
- EC FFE Shiawassee County · 55.8
- Greenfield (UNKNOWN128557 - TAP139918) · 54.7
- Durand Property · 54.5
- Mine Site · 9859cf29 · 54.4
- Mine Site · 1bc2b271 · 54.4
- Mine Site · 6febf128 · 54.3
- Mine Site · a59a6f7f · 54.2
- Laingsburg · 54.2
- Greenfield (UNKNOWN131565 - TAP145816) · 54.0
- Mine Site · 75be2736 · 53.9
- Former Redmond Co · 53.7
- Mine Site · 90cd592c · 53.7
- Mine Site · 32e47ab0 · 53.2
Shiawassee County datacenter FAQ
How many datacenter sites are in Shiawassee County?
19 scored datacenter candidate sites, averaging 56.4/100 DC Readiness. That is the 59th-most of 81 Michigan counties with five or more sites.
What is the highest-scoring datacenter site in Shiawassee County?
GOSS scores 66.5/100 DC Readiness, the highest of the 19 scored sites in Shiawassee County (a substation-adjacent site).
Does Shiawassee County offer datacenter tax incentives?
Personal property tax exemption for eligible DC equipment; MEGA tax credits.
What is the natural-hazard risk in Shiawassee County?
FEMA's National Risk Index rates Shiawassee County as "Relatively Moderate" (score 25).
What are industrial electricity rates in Shiawassee County?
Average industrial electricity is 4.59¢/kWh and commercial is 8.96¢/kWh in Shiawassee County.
More in Michigan
- All datacenter sites in Michigan· 5,157 sites
- Operating datacenters in Michigan
- Electric substations in Michigan
- Wayne County· 569 sites · avg 57.9
- Oakland County· 354 sites · avg 57.2
- Kent County· 242 sites · avg 57.7
- Saginaw County· 199 sites · avg 53.0
- Calhoun County· 174 sites · avg 54.4
- Genesee County· 174 sites · avg 54.6
- Former Mine sites in Michigan
- Substation-Adjacent sites in Michigan
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Shiawassee County, Michigan”, https://gridcensus.com/datacenter-sites/michigan/shiawassee-county (data as of November 13, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Shiawassee County, Michigan is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.