Skip to content
Gridcensus

Shiawassee County, Michigan · PJM

DC Readiness
62.9
Good / 100

GOSS is a substation-adjacent datacenter candidate site in Shiawassee County, Michigan, interconnecting through PJM. It screens at 62.9/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationGOSS
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityCONSUMERS ENERGY COinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load contract terms; MI DC sales/use-tax exemption (2025) · 15 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth17
Avg queue wait3.8 yrs

Connectivity

Nearest IXPLiquid Web DC3
IXP distance42.7 mi
Fiber providers9
Fiber coverage52.7%

Site characteristics

Land contactShiawassee County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDatacenter 00755540694
DC distance9.1 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.96¢/kWh
Industrial electricity4.59¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$6,037

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track GOSS

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
37
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Shiawassee County, ranked by DC Readiness.

Sites near GOSS
SiteTypeVoltageCapacityQueue waitScore
TAP145816Substation-Adjacent138 kV100 MW3.8 yrs56.9
UNKNOWN128557Substation-Adjacent138 kV100 MW3.8 yrs56.6
UNKNOWN128560Substation-Adjacent138 kV100 MW3.8 yrs56.5
UNKNOWN128564Substation-Adjacent138 kV100 MW3.8 yrs56.5
UNKNOWN128565Substation-Adjacent138 kV100 MW3.8 yrs56.3
EC FFE Shiawassee CountyGreenfield——2.2 yrs53.8
Greenfield (UNKNOWN128557 - TAP139918)Greenfield138 kV100 MW3.8 yrs51.1
Durand PropertyIndustrial——3.8 yrs51.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GOSS, Shiawassee County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.