Datacenter Sites in Norfolk County, Massachusetts
Norfolk County has 73 scored datacenter candidate sites averaging 58.5/100 DC Readiness, with a catalogued aggregate of 7,818 MW. FEMA rates local natural-hazard risk as "Relatively Low".
At a glance
Norfolk County, Massachusetts has 73 scored datacenter candidate sites averaging 58.5/100 DC Readiness, roughly in line with the Massachusetts average of 54.2. It ranks 10th of 13 Massachusetts counties by number of sites and 1st by average score. The top-scoring site is HOLBROOK at 66.7/100.
Site-selection context for Norfolk County
How does Norfolk County compare with other counties in Massachusetts?
By number of scored sites, Norfolk County ranks 10th of the 13 Massachusetts counties with a county page, holding 3.9% of the state's 1,861 sites. Its average DC Readiness of 58.5/100 ranks 1st in the state and is about 10% above the national average of 53.0. Nationally it has the 494th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 52 score 55 or higher.
What types of datacenter sites are in Norfolk County?
Substation-Adjacent sites are the most common (37, 51% of the county's inventory), followed by industrial (16) and greenfield (7). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Norfolk County?
Industrial electricity averages 16.31¢/kWh and commercial 16.56¢/kWh. FEMA's National Risk Index rates the county "Relatively Low" (22). WRI water stress is low. 11 fiber providers report service in the county. The climate runs 600 cooling degree days a year with a mean temperature of 49°F. Land is valued around $20,134 an acre.
By site type
Top datacenter sites in Norfolk County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| HOLBROOK | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 66.7 |
| AUBURN STREET | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 66.5 |
| STOUGHTON | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 66.2 |
| WEST WALPOLE | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 66.1 |
| UNKNOWN132928 | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 65.7 |
| WEST MEDWAY | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 65.7 |
| BERRY STREET | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 65.6 |
| UNKNOWN133458 | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 64.6 |
| FRAMINGHAM | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 64.5 |
| WALPOLE | Substation-Adjacent | 230 kV | 300 MW | 4.3 yrs | 64.3 |
| Randolph Landfill Solar | Brownfield | — | 5 MW | 4.3 yrs | 62.0 |
| NEEDHAM | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 61.7 |
| BAKER STREET | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 61.6 |
| EC Near Potter Station 2 | Greenfield | — | — | 4.3 yrs | 61.0 |
| UNKNOWN161817 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 60.8 |
| UNKNOWN133691 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 60.7 |
| EAST HOLBROOK | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 60.6 |
| TAP136263 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 60.6 |
| SOUTH RANDOLPH | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 60.3 |
| UNKNOWN136273 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 60.3 |
| SHERBORN | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 60.2 |
| NORWOOD | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 60.2 |
| UNKNOWN133544 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 60.2 |
| EC Near Randolph Electric | Greenfield | — | — | 4.3 yrs | 60.1 |
| Braintree Landfill | Brownfield | 115 kV | 1 MW | 4.3 yrs | 60.1 |
Every scored site in Norfolk County
All 73 sites, best first.
- HOLBROOK · 66.7
- AUBURN STREET · 66.5
- STOUGHTON · 66.2
- WEST WALPOLE · 66.1
- WEST MEDWAY · 65.7
- Substation-Adjacent site · 0bd6dfac · 65.7
- BERRY STREET · 65.6
- Substation-Adjacent site · a4476d91 · 64.6
- FRAMINGHAM · 64.5
- WALPOLE · 64.3
- Randolph Landfill Solar · 62.0
- NEEDHAM · 61.7
- BAKER STREET · 61.6
- EC Near Potter Station 2 · 620d99ad · 61.0
- Substation-Adjacent site · 4c80fc99 · 60.8
- Substation-Adjacent site · 65480cf7 · 60.7
- EAST HOLBROOK · 60.6
- Substation-Adjacent site · 588bc2ec · 60.6
- SOUTH RANDOLPH · 60.3
- Substation-Adjacent site · bf5dbfb9 · 60.3
- NORWOOD · 60.2
- SHERBORN · 60.2
- Substation-Adjacent site · cfece625 · 60.2
- EC Near Randolph Electric · bf894e68 · 60.1
- Braintree Landfill · 60.1
- Substation-Adjacent site · d7cbe697 · 60.0
- CANTON · 60.0
- Substation-Adjacent site · 081bd748 · 59.9
- Substation-Adjacent site · 40d4135d · 59.9
- PARKVIEW · 59.9
- BELMONT · 59.9
- Substation-Adjacent site · 6e9d23e8 · 59.9
- Substation-Adjacent site · 5d85623b · 59.8
- ROCKY HILL · 59.8
- Substation-Adjacent site · c61381f4 · 59.8
- NORTH ATTLEBORO · 59.7
- MANSFIELD · 59.7
- EASTON · 59.5
- SOUTH WRENTHAM · 59.3
- EC Near Potter Station 2 · 65b39cac · 59.3
- Substation-Adjacent site · 93875a8d · 58.6
- UNION STREET · 58.6
- EC Near Potter Station 2 · b0f441cf · 58.4
- EC Near Potter Station 2 · 66fa3cca · 57.8
- EC Near Randolph Electric · d6e85a54 · 57.2
- EC Near Potter Station 2 · ec2135c6 · 57.1
- Randolph Electric · 56.5
- CSO NAS South Weymouth · 56.1
- 157 Washington Street · 55.6
- Mine Site · 885758be · 55.5
- Mansfield · 55.4
- East Bridgewater · 55.2
- Mine Site · c71d07ad · 54.5
- 3 Arlington Street · 54.5
- Mine Site · d6cae84f · 54.4
- Quarry Street Development Site · 54.4
- Central Business Dist Park Lot · 54.1
- 757 Main Street · 54.1
- 1333 Main Street · 54.1
- Mine Site · e2c110f3 · 54.0
- Mine Site · 6fcd59ef · 53.7
- Mine Site · c7d398ee · 53.7
- Whiting and Davis Company · 53.5
- Plainville Stock · 53.5
- Sue's Laundry · 53.5
- Caryville Mill · 53.5
- Marra Property · 53.3
- Pearl Street Mill · 52.7
- Old Sewer Beds · 52.6
- Nu-Style Building · 52.6
- Mine Site · afb54a0e · 52.6
- Doug's Texaco · 52.5
- The Foot-The Toof · 51.6
Norfolk County datacenter FAQ
How many datacenter sites are in Norfolk County?
73 scored datacenter candidate sites, averaging 58.5/100 DC Readiness. That is the 10th-most of 13 Massachusetts counties with five or more sites.
What is the highest-scoring datacenter site in Norfolk County?
HOLBROOK scores 66.7/100 DC Readiness, the highest of the 73 scored sites in Norfolk County (a substation-adjacent site).
Does Norfolk County offer datacenter tax incentives?
No datacenter-specific tax incentive is on record for Norfolk County in the GridCensus county dataset.
What is the natural-hazard risk in Norfolk County?
FEMA's National Risk Index rates Norfolk County as "Relatively Low" (score 22).
What are industrial electricity rates in Norfolk County?
Average industrial electricity is 16.31¢/kWh and commercial is 16.56¢/kWh in Norfolk County.
More in Massachusetts
- All datacenter sites in Massachusetts· 1,861 sites
- Operating datacenters in Massachusetts
- Electric substations in Massachusetts
- Worcester County· 283 sites · avg 53.4
- Middlesex· 281 sites · avg 56.9
- Essex County· 216 sites · avg 54.5
- Suffolk County· 206 sites · avg 56.5
- Hampden County· 175 sites · avg 54.8
- Bristol County· 161 sites · avg 52.5
- Substation-Adjacent sites in Massachusetts
- Industrial sites in Massachusetts
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Norfolk County, Massachusetts”, https://gridcensus.com/datacenter-sites/massachusetts/norfolk-county (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Norfolk County, Massachusetts is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.