Doug's Texaco

Industrial

Norfolk County, Massachusetts · ISO-NE

DC Readiness
42.4
Fair / 100

Doug's Texaco is a industrial datacenter candidate site in Norfolk County, Massachusetts, interconnecting through ISO-NE. It screens at 42.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth32

Connectivity

Nearest IXPDigital Realty BOS (128 1st Ave)
IXP distance16.5 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDigital Realty BOS (105 Cabot)
DC distance16.5 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity16.56¢/kWh
Industrial electricity16.31¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$20,134

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
26
Fiber connectivity12%
64
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Norfolk County, ranked by DC Readiness.

Sites near Doug's Texaco
SiteTypeVoltageCapacityQueue waitScore
ANP BELLINGHAM ENERGY PROJECTSubstation-Adjacent345 kV600 MW3.5 yrs72.9
ANP BELLINGHAM ENERGY PROJECTSubstation-Adjacent345 kV600 MW3.5 yrs69.8
TAP136343Substation-Adjacent345 kV600 MW3.5 yrs69.6
WEST MEDWAYSubstation-Adjacent345 kV600 MW3.5 yrs68.0
HYDE PARKSubstation-Adjacent345 kV600 MW3.5 yrs67.6
UNKNOWN133458Substation-Adjacent230 kV300 MW3.5 yrs67.2
NORTH ATTLEBOROSubstation-Adjacent115 kV100 MW3.5 yrs66.9
WALPOLESubstation-Adjacent230 kV300 MW3.5 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Doug's Texaco, Norfolk County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.