Datacenter Sites in Sumner, Kansas
Sumner has 49 scored datacenter candidate sites averaging 56.0/100 DC Readiness, with a catalogued aggregate of 2,050 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
At a glance
Sumner, Kansas has 49 scored datacenter candidate sites averaging 56.0/100 DC Readiness, roughly in line with the Kansas average of 53.6. It ranks 9th of 90 Kansas counties by number of sites and 7th by average score. The top-scoring site is Substation-Adjacent site · d09fd46e at 62.0/100.
Site-selection context for Sumner
Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.
How does Sumner compare with other counties in Kansas?
By number of scored sites, Sumner ranks 9th of the 90 Kansas counties with a county page, holding 2.1% of the state's 2,352 sites. Its average DC Readiness of 56.0/100 ranks 7th in the state and is roughly in line with the national average of 53.0. Nationally it has the 777th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 35 score 55 or higher.
What types of datacenter sites are in Sumner?
Greenfield sites are the most common (31, 63% of the county's inventory), followed by substation-adjacent (13) and industrial (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Sumner?
Industrial electricity averages 9.27¢/kWh and commercial 11.42¢/kWh. FEMA's National Risk Index rates the county "Relatively High" (35). WRI water stress is medium-high. 11 fiber providers report service in the county. The climate runs 1,400 cooling degree days a year with a mean temperature of 55°F. Land is valued around $2,223 an acre.
By site type
Top datacenter sites in Sumner
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN168687 | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 62.0 |
| EC Near Mulvane Power Plant | Greenfield | — | — | 4.3 yrs | 61.0 |
| EC Near Oxford (KS) | Greenfield | — | — | 4.3 yrs | 59.3 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 59.1 |
| EC Near Oxford (KS) | Greenfield | — | — | 4.3 yrs | 59.0 |
| EC Near Mulvane Power Plant | Greenfield | — | — | 4.3 yrs | 58.7 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 58.5 |
| EC Near Mulvane Power Plant | Greenfield | — | — | 4.3 yrs | 58.5 |
| EC Near Mulvane Power Plant | Greenfield | — | — | 4.3 yrs | 58.5 |
| EC Near Mulvane Power Plant | Greenfield | — | — | 4.3 yrs | 58.2 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 58.2 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 57.7 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 57.7 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 57.7 |
| EC Near Mulvane Power Plant | Greenfield | — | — | 4.3 yrs | 57.7 |
| EC Near Oxford (KS) | Greenfield | — | — | 4.3 yrs | 57.5 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 57.4 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 57.1 |
| EC Near Oxford (KS) | Greenfield | — | — | 4.3 yrs | 57.0 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 57.0 |
| EC Near Mulvane Power Plant | Greenfield | — | — | 4.3 yrs | 56.8 |
| EC Near Mulvane Power Plant | Greenfield | — | — | 4.3 yrs | 56.7 |
| EC Near Oxford (KS) | Greenfield | — | — | 4.3 yrs | 56.5 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 56.4 |
| TAP148772 | Substation-Adjacent | 138 kV | 100 MW | 4.3 yrs | 56.4 |
Every scored site in Sumner
All 49 sites, best first.
- Substation-Adjacent site · d09fd46e · 62.0
- EC Near Mulvane Power Plant · ac44b76b · 61.0
- EC Near Oxford (KS) · 6092fb10 · 59.3
- EC Near Wellington 1 · 17297723 · 59.1
- EC Near Oxford (KS) · 8e1f90a5 · 59.0
- EC Near Mulvane Power Plant · 6f27a912 · 58.7
- EC Near Wellington 1 · 25aeeb58 · 58.5
- EC Near Mulvane Power Plant · 202462a9 · 58.5
- EC Near Mulvane Power Plant · 229047f4 · 58.5
- EC Near Mulvane Power Plant · b9e357e2 · 58.2
- EC Near Wellington 1 · 3f98e422 · 58.2
- EC Near Wellington 1 · f76ff656 · 57.7
- EC Near Wellington 1 · 2b82828c · 57.7
- EC Near Wellington 1 · 97d6fd77 · 57.7
- EC Near Mulvane Power Plant · 03b76beb · 57.7
- EC Near Oxford (KS) · e190cc36 · 57.5
- EC Near Wellington 1 · ed0c4984 · 57.4
- EC Near Wellington 1 · 62821a20 · 57.1
- EC Near Oxford (KS) · b60a71cd · 57.0
- EC Near Wellington 1 · c3682d8f · 57.0
- EC Near Mulvane Power Plant · 4fefb57b · 56.8
- EC Near Mulvane Power Plant · e2e9f303 · 56.7
- EC Near Oxford (KS) · 4fed6002 · 56.5
- EC Near Wellington 1 · 4284ab41 · 56.4
- Substation-Adjacent site · a99625df · 56.4
- Substation-Adjacent site · 131d1964 · 56.4
- EC Near Oxford (KS) · 67250c21 · 56.3
- EC Near Wellington 1 · 9a199ba3 · 56.3
- Substation-Adjacent site · e46ee1b3 · 56.3
- EC Near Oxford (KS) · 30e8a365 · 56.3
- EC Near Oxford (KS) · 15a91367 · 56.0
- Greenfield (UNKNOWN168687 - UNKNOWN168688) · 55.6
- Substation-Adjacent site · 0cdc8ee9 · 55.5
- Substation-Adjacent site · 6158fdb2 · 55.3
- EC Near Oxford (KS) · 389e12a3 · 55.1
- EC Near Mulvane Power Plant · f640fce3 · 54.9
- EC Near Oxford (KS) · 5cb783f1 · 54.6
- Substation-Adjacent site · 0d50b960 · 54.2
- Substation-Adjacent site · e5bf0290 · 53.8
- Substation-Adjacent site · 8351ef2a · 53.3
- Substation-Adjacent site · 7c376f2a · 53.2
- Substation-Adjacent site · a7910911 · 53.0
- Substation-Adjacent site · ebc9ec99 · 52.9
- Substation-Adjacent site · 5f616171 · 52.7
- Mine Site · e2949ea7 · 50.2
- Carnegie Library BTA · 50.1
- Caldwell Community Building · 50.1
- Caldwell Market Street BTA · 50.1
- Former Cargill B Mill · 49.3
Sumner datacenter FAQ
How many datacenter sites are in Sumner?
49 scored datacenter candidate sites, averaging 56.0/100 DC Readiness. That is the 9th-most of 90 Kansas counties with five or more sites.
What is the highest-scoring datacenter site in Sumner?
Substation-Adjacent site · d09fd46e scores 62.0/100 DC Readiness, the highest of the 49 scored sites in Sumner (a substation-adjacent site).
Does Sumner offer datacenter tax incentives?
PEAK program payroll tax incentives; IRB property tax exemptions available.
What is the natural-hazard risk in Sumner?
FEMA's National Risk Index rates Sumner as "Relatively High" (score 35).
What are industrial electricity rates in Sumner?
Average industrial electricity is 9.27¢/kWh and commercial is 11.42¢/kWh in Sumner.
More in Kansas
- All datacenter sites in Kansas· 2,352 sites
- Operating datacenters in Kansas
- Electric substations in Kansas
- Sedgwick· 273 sites · avg 53.9
- Wyandotte· 153 sites · avg 56.9
- Shawnee County· 77 sites · avg 52.1
- Montgomery County· 76 sites · avg 50.4
- Johnson County· 63 sites · avg 59.3
- Bourbon County· 60 sites · avg 49.6
- Greenfield sites in Kansas
- Substation-Adjacent sites in Kansas
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Sumner, Kansas”, https://gridcensus.com/datacenter-sites/kansas/sumner (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Sumner, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.