EC Near Mulvane Power Plant

Greenfield

Sumner, Kansas · SPP

DC Readiness
55.1
Good / 100

At a glance

EC Near Mulvane Power Plant is a greenfield datacenter candidate site in Sumner, Kansas, scoring 55.1/100 DC Readiness — 34th of 49 scored sites in the county. It sits in the SPP grid region and the EVERGY KANSAS CENTRAL, INC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

Nearest grid bottleneckTP1136_32015 · 38 km (SPP)
LMP zoneSPP_NORTH
Wholesale LMP$21.13/MWh
Utility commercial rate0.11¢/kWh
UtilityEVERGY KANSAS CENTRAL, INCinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth59
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPOneNet OSU Tulsa
IXP distance115.1 mi
Fiber providers11
Fiber coverage81.1%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance266.8 mi

Site characteristics

Site typeGreenfield
Land contactSumner County Assessor
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest
Former usenear retired gas plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)2.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index89.0 (avg 100)

Location context

Nearest datacenterSC DC
DC distance80.0 mi
Nearest rail0.5 mi
Nearest gas pipeline2.0 mi
Nearest fiber route8.4 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.42¢/kWh
Industrial electricity9.27¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,223

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Mulvane Power Plant

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Near Mulvane Power Plant compare with other sites in Sumner?

EC Near Mulvane Power Plant ranks 34th of 49 scored candidate sites in Sumner. Its 55.1/100 is roughly in line with the county average of 55.6. It is roughly in line with the Kansas average of 53.2 and roughly in line with the national average of 53.2.

Against the Kansas average, its strongest sub-score is natural hazard (65 vs 64) and its weakest is power availability (30 vs 38). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Near Mulvane Power Plant to power, fiber and other datacenters?

The nearest located transmission bottleneck is TP1136_32015 (SPP), 23 miles away. For connectivity, the nearest internet exchange facility is OneNet OSU Tulsa at 115.1 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is SC DC, 80 miles away.

What are the flood, water and hazard risks at EC Near Mulvane Power Plant?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 2.40 on a 0–5 scale. No mapped wetlands are recorded on the parcel. At the county level, FEMA's National Risk Index rates Sumner "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
55
Fiber connectivity12%
72
Energy cost10%
88
Water risk7%
52
Natural hazard6%
65
Buildability7%
45
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
76
Gas pipeline2%
94
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Sumner, ranked by DC Readiness.

Sites near EC Near Mulvane Power Plant
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN168687Substation-Adjacent345 kV600 MW4.3 yrs62.0
EC Near Oxford (KS)Greenfield——4.3 yrs59.3
EC Near Wellington 1Greenfield——4.3 yrs59.1
EC Near Mulvane Power PlantGreenfield——4.3 yrs59.1
EC Near Oxford (KS)Greenfield——4.3 yrs59.0
EC Near Wellington 1Greenfield——4.3 yrs58.5
EC Near Wellington 1Greenfield——4.3 yrs58.2
EC Near Wellington 1Greenfield——4.3 yrs57.6

EC Near Mulvane Power Plant: common questions

What is the DC Readiness score of EC Near Mulvane Power Plant?

EC Near Mulvane Power Plant scores 55.1/100 on the GridCensus DC Readiness scale, rated good. It ranks 34th of 49 scored sites in Sumner. The Sumner average is 55.6 and the Kansas average is 53.2.

Which electric utility serves EC Near Mulvane Power Plant?

EVERGY KANSAS CENTRAL, INC (investor owned) holds the retail service territory that contains the site; its holding company is WESTAR ENERGY INC.

What grid region is EC Near Mulvane Power Plant in?

EC Near Mulvane Power Plant is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is EC Near Mulvane Power Plant in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC Near Mulvane Power Plant?

Parcel records list the owner as KANSAS GAS & ELECTRIC CO (private land).

How far is EC Near Mulvane Power Plant from an internet exchange?

The nearest internet exchange facility is OneNet OSU Tulsa, about 115.1 miles away; 11 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Near Mulvane Power Plant, Sumner, KS”, https://gridcensus.com/datacenter-sites/kansas/sumner/ec-near-mulvane-power-plant-e2e9f303 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Mulvane Power Plant, Sumner is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.