Skip to content
Gridcensus

UNKNOWN168687

Substation-Adjacent

Sumner, Kansas · SPP

DC Readiness
61.9
Good / 100

UNKNOWN168687 is a substation-adjacent datacenter candidate site in Sumner, Kansas, interconnecting through SPP. It screens at 61.9/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN168687
Nearest grid bottleneckTP1136_32015 · 53 km (SPP)
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityEVERGY KANSAS CENTRAL, INCinvestor ownedfavorable to large load · terms ≥ 75 MWLarge Load Power Service (LLPS, ≥75 MW) · 80% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth64
Avg queue wait3.3 yrs

Connectivity

Nearest IXPMidcon Recovery Solutions B3 Data Center
IXP distance118.6 mi
Fiber providers11
Fiber coverage81.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterSC DC
DC distance50.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.42¢/kWh
Industrial electricity9.27¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$2,223

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN168687

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
54
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
52
Natural hazard6%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Sumner, ranked by DC Readiness.

Sites near UNKNOWN168687
SiteTypeVoltageCapacityQueue waitScore
EC Near Oxford (KS)Greenfield3.5 yrs60.3
EC Near Wellington 1Greenfield3.5 yrs60.1
EC Near Mulvane Power PlantGreenfield3.5 yrs60.1
EC Near Oxford (KS)Greenfield3.5 yrs60.0
EC Near Wellington 1Greenfield3.5 yrs59.5
EC Near Wellington 1Greenfield3.5 yrs59.2
EC Near Wellington 1Greenfield3.5 yrs58.6
EC Near Mulvane Power PlantGreenfield3.5 yrs58.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN168687, Sumner. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.