Datacenter Sites in Sedgwick, Kansas

Sedgwick has 240 scored datacenter candidate sites averaging 47.4/100 DC Readiness, with a catalogued aggregate of 10,931 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

240
Candidate sites
47.4/100
Avg DC Readiness
10,931 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for Sedgwick

Yesproperty_tax_exemption
Datacenter tax incentive
11.24¢/kWh
Commercial electricity
7.71¢/kWh
Industrial electricity
13
Fiber providers
Medium-High
Water stress
$3,923
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

By site type

Top datacenter sites in Sedgwick

Top datacenter sites in Sedgwick
SiteTypeVoltageCapacityQueue waitScore
Gordon Evans Energy CenterBrownfield526 MW72.2
WICHITASubstation-Adjacent345 kV600 MW3.5 yrs69.5
UNKNOWN168687Substation-Adjacent345 kV600 MW3.5 yrs69.3
UNKNOWN168685Substation-Adjacent345 kV600 MW3.5 yrs69.1
UNKNOWN118003Substation-Adjacent138 kV100 MW3.5 yrs67.7
UNKNOWN118016Substation-Adjacent138 kV100 MW3.5 yrs65.9
UNKNOWN119286Substation-Adjacent138 kV100 MW3.5 yrs65.8
UNKNOWN118005Substation-Adjacent138 kV100 MW3.5 yrs65.7
UNKNOWN118249Substation-Adjacent138 kV100 MW3.5 yrs65.4
MURRAY GILLSubstation-Adjacent138 kV100 MW3.5 yrs65.3
UNKNOWN118248Substation-Adjacent138 kV100 MW3.5 yrs64.8
UNKNOWN159536Substation-Adjacent138 kV100 MW3.5 yrs64.5
UNKNOWN118009Substation-Adjacent138 kV100 MW3.5 yrs64.3
UNKNOWN119815Substation-Adjacent138 kV100 MW3.5 yrs64.2
Greenfield (WICHITA - BENTON)Greenfield345 kV600 MW3.5 yrs64.1
UNKNOWN118015Substation-Adjacent138 kV100 MW3.5 yrs64.0
TAP159538Substation-Adjacent138 kV100 MW3.5 yrs63.8
Greenfield (THISTLE - UNKNOWN168685)Greenfield345 kV600 MW3.5 yrs63.5
UNKNOWN118240Substation-Adjacent138 kV100 MW3.5 yrs63.4
UNKNOWN118238Substation-Adjacent138 kV100 MW3.5 yrs63.4
UNKNOWN118247Substation-Adjacent138 kV100 MW3.5 yrs63.2
UNKNOWN118243Substation-Adjacent138 kV100 MW3.5 yrs63.2
Greenfield (WICHITA - UNKNOWN168687)Greenfield345 kV600 MW3.5 yrs63.2
UNKNOWN118012Substation-Adjacent138 kV100 MW3.5 yrs62.8
Greenfield (THISTLE - UNKNOWN168685)Greenfield345 kV600 MW3.5 yrs62.5

Sedgwick datacenter FAQ

How many datacenter sites are in Sedgwick?
240 scored datacenter candidate sites, averaging 47.4/100 DC Readiness.
Does Sedgwick offer datacenter tax incentives?
PEAK program payroll tax incentives; IRB property tax exemptions available.
What is the natural-hazard risk in Sedgwick?
FEMA's National Risk Index rates Sedgwick as "Relatively High" (score 35).
What are industrial electricity rates in Sedgwick?
Average industrial electricity is 7.71¢/kWh and commercial is 11.24¢/kWh in Sedgwick.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Sedgwick, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.