EC Near Gordon Evans Energy Center
GreenfieldSedgwick, Kansas · SPP
EC Near Gordon Evans Energy Center is a greenfield datacenter candidate site in Sedgwick, Kansas, interconnecting through SPP. It screens at 58.0/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Sedgwick, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Gordon Evans Energy Center | Brownfield | — | 526 MW | — | 72.2 |
| WICHITA | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 69.5 |
| UNKNOWN168687 | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 69.3 |
| UNKNOWN168685 | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 69.1 |
| UNKNOWN118003 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 67.7 |
| UNKNOWN118016 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 65.9 |
| UNKNOWN119286 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 65.8 |
| UNKNOWN118005 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 65.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC Near Gordon Evans Energy Center, Sedgwick. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.