Caldwell Community Building
IndustrialSumner, Kansas · SPP
At a glance
Caldwell Community Building is an industrial datacenter candidate site in Sumner, Kansas, scoring 50.1/100 DC Readiness — 45th of 49 scored sites in the county. It sits in the SPP grid region and the EVERGY KANSAS SOUTH, INC service territory, where interconnection has averaged 4.3 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.
Site location
Get alerts
Track Caldwell Community Building
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Caldwell Community Building compare with other sites in Sumner?
Caldwell Community Building ranks 45th of 49 scored candidate sites in Sumner. Its 50.1/100 is roughly in line with the county average of 55.6. It is roughly in line with the Kansas average of 53.2 and roughly in line with the national average of 53.2.
Against the Kansas average, its strongest sub-score is fiber connectivity (73 vs 71) and its weakest is power availability (30 vs 38). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Caldwell Community Building to power, fiber and other datacenters?
The nearest located transmission bottleneck is TP1136_32015 (SPP), 52 miles away. For connectivity, the nearest internet exchange facility is Midcon Recovery Solutions B3 Data Center at 97.7 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is SC DC, 56.8 miles away.
What are the flood, water and hazard risks at Caldwell Community Building?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Sumner "Relatively High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Sumner, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN168687 | Substation-Adjacent | 345 kV | 600 MW | 4.3 yrs | 62.0 |
| EC Near Oxford (KS) | Greenfield | — | — | 4.3 yrs | 59.3 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 59.1 |
| EC Near Mulvane Power Plant | Greenfield | — | — | 4.3 yrs | 59.1 |
| EC Near Oxford (KS) | Greenfield | — | — | 4.3 yrs | 59.0 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 58.5 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 58.2 |
| EC Near Wellington 1 | Greenfield | — | — | 4.3 yrs | 57.6 |
Caldwell Community Building: common questions
What is the DC Readiness score of Caldwell Community Building?
Caldwell Community Building scores 50.1/100 on the GridCensus DC Readiness scale, rated fair. It ranks 45th of 49 scored sites in Sumner. The Sumner average is 55.6 and the Kansas average is 53.2.
Which electric utility serves Caldwell Community Building?
EVERGY KANSAS SOUTH, INC (investor owned) holds the retail service territory that contains the site; its holding company is WESTAR ENERGY.
What grid region is Caldwell Community Building in?
Caldwell Community Building is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
Is Caldwell Community Building in a flood zone?
The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).
How far is Caldwell Community Building from an internet exchange?
The nearest internet exchange facility is Midcon Recovery Solutions B3 Data Center, about 97.7 miles away; 11 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Caldwell Community Building, Sumner, KS”, https://gridcensus.com/datacenter-sites/kansas/sumner/caldwell-community-building-1e8e6b8e (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Caldwell Community Building, Sumner is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.