Brownfield & Retired Power Plant Sites in Tennessee

22 catalogued brownfield and retired-generation sites in Tennessee, listed by former capacity. Each carries an existing utility-scale grid interconnection that a new datacenter load may be able to re-use.

At a glance

Tennessee has 22 brownfield and retired-generation sites in GridCensus: 11 retired power plants from EIA-860 and 11 EPA-tracked contaminated or reuse sites. Together they record 5,136 MW of existing or former generating capacity, 20th among 50 states and DC. The largest by capacity is Johnsonville at 1,485.2 MW.

What kinds of former sites are in Tennessee?

By former use, the list includes 6 coal, 4 landfill, 3 Superfund, 2 natural gas, 2 biomass, 2 mine and 3 other categories. Recorded retirement dates run from October 2006 to September 2023, with 6 retirements in 2015 or later. 19 of 21 sites with a measured distance sit within 2 miles of a transmission substation.

How does Tennessee compare with other states?

Tennessee ranks 30th of 50 states and DC by number of brownfield and retired-generation sites, out of 2,085 nationally. By recorded capacity (5,136 MW) it ranks 20th, against 289,280 MW across all states. The state also has 2,190 scored datacenter candidate sites, 9 of them classed as brownfield sites, averaging 57 on the 0–100 DC Readiness scale.

Where in Tennessee are these sites?

All brownfield and retired plant sites in Tennessee

SiteFormer useCapacityRetiredCounty
Johnsonvillecoal1,485 MW2017-12-01Humphreys
Allencoal990 MW2018-03-01Shelby
Bull Runcoal950 MW2023-09-01Anderson
John Seviercoal800 MW2014-06-01Hawkins
Franklin (TN)gas510 MW—Franklin
Watts Bar Fossilcoal240 MW2011-12-01Rhea
Bowater Newsprint Calhoun Operationbiomass63 MW2022-05-01McMinn
Buffalo Mountain Stage 2mine27 MW——
Domtar Kingsport Millbiomass23 MW2006-10-01Sullivan
Vanderbilt University Power Plantcoal16 MW2016-03-01Davidson
MTSU Power Co-Gen Plantoil10 MW2016-11-01Rutherford
Volkswagen Chattanoogarcra10 MW——
Middle Point Landfill Gas Recoverygas3 MW2011-12-01Rutherford
Somerville Solar Projectlandfill3 MW——
Music City Solarlandfill2 MW——
Buffalo Mountainmine2 MW——
Knoxville Utilities Board Community Solarmanufacturing1 MW——
Powerhouse Six Arraysuperfund1 MW——
RSI Brightfields Onesuperfund0 MW——
Bristol Demolition Landfilllandfill0 MW——
Binkley Solar Farmlandfill0 MW——
OAK RIDGE RESERVATION (USDOE)superfund0 MW——

Frequently asked questions

How many retired power plants are in Tennessee?

GridCensus lists 11 retired power plant sites in Tennessee from EIA-860 retirement records. 10 have a recorded retirement date, 6 of them in 2015 or later.

What is the largest retired power plant or brownfield site in Tennessee?

Johnsonville in New Johnsonville is the largest by recorded capacity, at 1,485.2 MW. It is followed by Allen (990 MW) and Bull Run (950 MW).

Which power plant in Tennessee retired most recently?

Bull Run has the latest recorded retirement date in the state, September 2023, with 950 MW of capacity.

Which county in Tennessee has the most brownfield and retired plant sites?

Rutherford County has the most, with 2, followed by Humphreys County with 1.

How many EPA brownfield sites in Tennessee have completed cleanup?

11 of the 11 EPA-tracked sites listed for Tennessee are recorded as cleanup complete.

Looking for a specific record? The directory lists every brownfield site, A to Z.

More on Tennessee, and states with similar counts

About this data

Source: EIA-860 retired generating units and EPA RE-Powering America's Land contaminated-site records, as published March 6, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Brownfield and retired power plant sites in Tennessee”, https://gridcensus.com/brownfield-sites/tennessee (data as of March 6, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for brownfield sites in Tennessee is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.