Legacy capacity
16
MW

Vanderbilt University Power Plant is a coal plant in Nashville, Davidson, Tennessee, retired 2016-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 16 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity16 MW
Retirement date2016-03-01
EIA plant ID#52048

Grid hookup & remediation

Nearest substation0.0 mi
OperatorVanderbilt University
Operator address24th Ave. South, Nashville, TN, 37240
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Vanderbilt University Power Plant, ranked by DC Readiness.

Candidate sites near Vanderbilt University Power Plant
SiteTypeStateCountyVoltageCapacityQueue waitScore
DAVIDSONSubstation-AdjacentTNCheatham County500 kV1,000 MW3.7 yrs78.2
WILSONSubstation-AdjacentTNWilson County500 kV1,000 MW3.7 yrs78.0
RUTHERFORDSubstation-AdjacentTNWilliamson County500 kV1,000 MW3.7 yrs76.5
Greenfield (PIN HOOK - DAVIDSON)GreenfieldTNWilliamson County500 kV1,000 MW3.7 yrs75.9
CANE RIDGESubstation-AdjacentTNDavidson County161 kV100 MW3.7 yrs75.1
TAP155917Substation-AdjacentTNDavidson County161 kV100 MW3.7 yrs75.0
ELYSLANSubstation-AdjacentTNDavidson County161 kV100 MW3.7 yrs74.7
TAP152207Substation-AdjacentTNDavidson County161 kV100 MW3.7 yrs74.6

Nearby internet exchanges

See all datacenter sites in Tennessee

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Vanderbilt University Power Plant, Nashville, Davidson, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.