Bristol Demolition Landfill
BrownfieldBristol, Tennessee
Bristol Demolition Landfill is a former landfill site in Bristol, Tennessee. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 0 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Bristol Demolition Landfill — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Clinch River | coal plant | 238 | 26.0 mi | — |
| Domtar Kingsport Mill | former biomass site | 23 | 19.5 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Bristol Demolition Landfill
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Bristol Demolition Landfill, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SULLIVAN | Substation-Adjacent | TN | Sullivan County | 500 kV | 1,000 MW | 1.0 yrs | 70.6 |
| Bristol Demolition Landfill | Brownfield | VA | Bristol | — | 0 MW | 1.0 yrs | 68.2 |
| OZ Sullivan | Greenfield | TN | Sullivan | — | — | 3.7 yrs | 64.7 |
| HOLSTON DAM | Substation-Adjacent | TN | Bristol city | 161 kV | 100 MW | 1.0 yrs | 63.4 |
| TAP154250 | Substation-Adjacent | TN | Scott County | 138 kV | 100 MW | 1.0 yrs | 63.3 |
| UNKNOWN115300 | Substation-Adjacent | TN | Scott County | 138 kV | 100 MW | 1.0 yrs | 63.3 |
| SHORT HILLS | Substation-Adjacent | TN | Scott County | 138 kV | 100 MW | 1.0 yrs | 63.2 |
| UNKNOWN115905 | Substation-Adjacent | TN | Washington County | 161 kV | 100 MW | 1.0 yrs | 62.7 |
See all datacenter sites in Tennessee →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.