Bull Run

Brownfield

Clinton, Anderson, Tennessee · Tennessee Valley Authority

Legacy capacity
950
MW

Bull Run is a coal plant in Clinton, Anderson, Tennessee, retired 2023-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 950 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity950 MW
Retirement date2023-09-01
EIA plant ID#3396

Grid hookup & remediation

Nearest substation0.1 mi
OperatorTennessee Valley Authority
Operator address1265 EDGEMOOR RD., Clinton, TN, 37716
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Bull Run, ranked by DC Readiness.

Candidate sites near Bull Run
SiteTypeStateCountyVoltageCapacityQueue waitScore
VOLUNTEERSubstation-AdjacentTNKnox County500 kV1,000 MW3.7 yrs77.4
BULL RUNSubstation-AdjacentTNAnderson County500 kV1,000 MW3.7 yrs75.7
Greenfield (VOLUNTEER - WATTS BAR POWER ST)GreenfieldTNUnion County500 kV1,000 MW3.7 yrs75.1
TAP152048Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs74.1
TAP155213Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.8
HEISKELLSubstation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.8
TAP155233Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.5
TAP152053Substation-AdjacentTNKnox County161 kV100 MW3.7 yrs73.5

Nearby internet exchanges

See all datacenter sites in Tennessee

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Bull Run, Clinton, Anderson, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.