LCUB Data Center
Internet ExchangeLenoir City · Lenoir City Utilities Board
LCUB Data Center is an internet exchange and peering facility in Lenoir City, operated by Lenoir City Utilities Board.. Carrier and peering density is a core fiber-connectivity input for datacenter siting: proximity to a well-peered exchange shortens the path to low-latency, multi-carrier transit and reduces backhaul cost for a new facility.
Peering & carrier density
Location
Nearby datacenters
- Frontier (supercomputer)Oak Ridge National Laboratory · TN
- Frontier (supercomputer)Oak Ridge National Laboratory · TN
- Peace Communications KNX1Peace Communications (Formerly Nexus Group) · Knoxville, TN
Nearby datacenter candidate sites
Scored candidate sites near LCUB Data Center, ranked by DC Readiness. Co-location near a well-peered exchange is a meaningful fiber-connectivity advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BULL RUN | Substation-Adjacent | TN | Anderson County | 500 kV | 1,000 MW | 1.0 yrs | 70.7 |
| UNKNOWN115540 | Substation-Adjacent | TN | Roane County | 500 kV | 1,000 MW | 1.0 yrs | 70.3 |
| OZ Knox | Greenfield | TN | Knox | — | — | 3.7 yrs | 68.8 |
| OZ Knox | Greenfield | TN | Knox | — | — | 3.7 yrs | 68.5 |
| OAK RIDGE RESERVATION (USDOE) | Brownfield | TN | Anderson | 161 kV | 0 MW | 1.0 yrs | 67.6 |
| OZ Knox | Greenfield | TN | Knox | — | — | 3.7 yrs | 66.8 |
| EATON | Substation-Adjacent | TN | Loudon County | 161 kV | 100 MW | 1.0 yrs | 66.8 |
| LONSDALE | Substation-Adjacent | TN | Knox County | 161 kV | 100 MW | 1.0 yrs | 66.7 |
Dataset updated . Screening estimates derived from public data sources.
Exchange and peering data is sourced from public PeeringDB records and may lag facility changes. Network and IX counts are point-in-time figures; confirm current peering options and cross-connect availability directly with the facility operator.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for LCUB Data Center, Lenoir City. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.