UNKNOWN115540
Substation-AdjacentRoane County, Tennessee · SERC
UNKNOWN115540 is a substation-adjacent datacenter candidate site in Roane County, Tennessee, interconnecting through SERC. It screens at 70.3/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Roane County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Greenfield (BULL RUN - WATTS BAR POWER STA) | Greenfield | 500 kV | 1,000 MW | 1.0 yrs | 64.1 |
| EC Coal Roane County | Greenfield | — | — | 3.7 yrs | 64.0 |
| Greenfield (UNKNOWN115540 - WATTS BAR POWE) | Greenfield | 500 kV | 1,000 MW | 1.0 yrs | 63.9 |
| UNKNOWN152223 | Substation-Adjacent | 161 kV | 100 MW | 1.0 yrs | 63.7 |
| OZ Roane | Greenfield | — | — | 3.7 yrs | 63.6 |
| TAP152167 | Substation-Adjacent | 161 kV | 100 MW | 1.0 yrs | 62.7 |
| TAP152173 | Substation-Adjacent | 161 kV | 100 MW | 1.0 yrs | 62.2 |
| EC Coal Roane County | Greenfield | — | — | 3.7 yrs | 62.1 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for UNKNOWN115540, Roane County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.