37 catalogued brownfield and retired-generation sites in Louisiana, listed by former capacity. Each carries an existing utility-scale grid interconnection that a new datacenter load may be able to re-use.

At a glance

Louisiana has 37 brownfield and retired-generation sites in GridCensus: 37 retired power plants from EIA-860 and 0 EPA-tracked contaminated or reuse sites. Together they record 9,443 MW of existing or former generating capacity, 8th among 50 states and DC. The largest by capacity is Willow Glen at 2,178 MW.

What kinds of former sites are in Louisiana?

By former use, the list includes 32 natural gas, 3 biomass, 2 coal. Recorded retirement dates run from January 1997 to December 2024, with 20 retirements in 2015 or later. 37 of 37 sites with a measured distance sit within 2 miles of a transmission substation.

How does Louisiana compare with other states?

Louisiana ranks 18th of 50 states and DC by number of brownfield and retired-generation sites, out of 2,085 nationally. By recorded capacity (9,443 MW) it ranks 8th, against 289,280 MW across all states. The state also has 1,762 scored datacenter candidate sites, 10 of them classed as brownfield sites, averaging 53.2 on the 0–100 DC Readiness scale.

Where in Louisiana are these sites?

All brownfield and retired plant sites in Louisiana

SiteFormer useCapacityRetiredCounty
Willow Glengas2,178 MW2018-03-01Iberville
Michoudgas959 MW2016-06-01Orleans
Big Cajun 2coal730 MW—Pointe Coupee
Dolet Hillscoal721 MW2021-12-01DeSoto
LaO Energy Systemsgas715 MW2024-12-01Iberville
Washington Parish Energy Centergas655 MW—Washington
Waterford 1 & 2gas446 MW2024-03-01St Charles
Techegas426 MW2024-06-01St Mary
Sterlingtongas415 MW2019-01-01Ouachita
Nine Mile Pointgas351 MW2016-11-01Jefferson
Louis Doc Boningas341 MW2017-04-01Lafayette
Little Gypsygas248 MW2015-06-01St Charles
D G Huntergas175 MW2016-03-01Rapides
R S Nelsongas163 MW2017-01-01Calcasieu
A B Patersongas149 MW2010-09-01Orleans
Monroe (LA)gas138 MW2011-10-01Ouachita
Plaquemine Operationsgas106 MW2002-11-01Iberville
Morgan Citygas70 MW2015-06-01St Mary
Liebermangas50 MW2020-05-01Caddo
St Francisville Millgas45 MW1999-07-01West Feliciana
Plaqueminegas44 MW2015-06-01Iberville
Rodemachergas39 MW1997-01-01Lafayette
Formosa Plasticsgas38 MW2010-01-01East Baton Rouge
Atlantic Alumina, Gramercy Operationsgas32 MW2010-02-01St James
New Orleansgas31 MW2010-06-01Orleans
PCS Nitrogen Fertilizer LPgas26 MW2005-12-01Iberville
Mansfield Millgas25 MW2019-05-01DeSoto
Thibodauxgas21 MW2002-01-01Lafourche
Burasgas21 MW2018-10-01Plaquemines
Houmagas20 MW2010-12-01Terrebonne
Dow St Charles Operationsgas20 MW2009-03-01St Charles
Plant 31 Paper Millgas18 MW2011-01-01Ouachita
Franklin (LA)gas10 MW2015-10-01St Mary
Westrock Hodge (LA)biomass8 MW2015-10-01Jackson
Louisiana Tech University Power Plantgas8 MW2008-02-01Lincoln
Enterprise Sugar Factorybiomass2 MW2024-12-01Iberia
Agrilectric Power Partners Ltdbiomass2 MW2007-03-01Calcasieu

Frequently asked questions

How many retired power plants are in Louisiana?

GridCensus lists 37 retired power plant sites in Louisiana from EIA-860 retirement records. 35 have a recorded retirement date, 20 of them in 2015 or later.

What is the largest retired power plant or brownfield site in Louisiana?

Willow Glen in St. Gabriel is the largest by recorded capacity, at 2,178 MW. It is followed by Michoud (959.2 MW) and Big Cajun 2 (730 MW).

Which power plant in Louisiana retired most recently?

LaO Energy Systems has the latest recorded retirement date in the state, December 2024, with 714.5 MW of capacity.

Which county in Louisiana has the most brownfield and retired plant sites?

Iberville County has the most, with 5, followed by Orleans County with 3.

Looking for a specific record? The directory lists every brownfield site, A to Z.

More on Louisiana, and states with similar counts

About this data

Source: EIA-860 retired generating units and EPA RE-Powering America's Land contaminated-site records, as published March 6, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Brownfield and retired power plant sites in Louisiana”, https://gridcensus.com/brownfield-sites/louisiana (data as of March 6, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for brownfield sites in Louisiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.