Datacenter Sites in Pointe Coupee Parish, Louisiana

Pointe Coupee Parish has 15 scored datacenter candidate sites averaging 54.1/100 DC Readiness, with a catalogued aggregate of 600 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

At a glance

Pointe Coupee Parish, Louisiana has 15 scored datacenter candidate sites averaging 54.1/100 DC Readiness, roughly in line with the Louisiana average of 53.1. It ranks 33rd of 59 Louisiana counties by number of sites and 16th by average score. The top-scoring site is Substation-Adjacent site · 6e8f9a17 at 59.9/100.

15
Candidate sites
54.1/100
Avg DC Readiness
600 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 15 in Pointe Coupee Parish

Site-selection context for Pointe Coupee Parish

Yessales_tax_exemption
Datacenter tax incentive
13.54¢/kWh
Commercial electricity
10.76¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$3,727
Land price / acre
2,700
Cooling degree days
1,700
Heating degree days
67°F
Mean annual temp

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

How does Pointe Coupee Parish compare with other counties in Louisiana?

By number of scored sites, Pointe Coupee Parish ranks 33rd of the 59 Louisiana counties with a county page, holding 0.9% of the state's 1,762 sites. Its average DC Readiness of 54.1/100 ranks 16th in the state and is roughly in line with the national average of 53.2. Nationally it has the 2019th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 6 score 55 or higher.

What types of datacenter sites are in Pointe Coupee Parish?

Greenfield sites are the most common (10, 67% of the county's inventory), followed by substation-adjacent (3) and industrial (2). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Pointe Coupee Parish?

Industrial electricity averages 10.76¢/kWh and commercial 13.54¢/kWh. FEMA's National Risk Index rates the county "Very High" (58). WRI water stress is low. 4 fiber providers report service in the county. The climate runs 2,700 cooling degree days a year with a mean temperature of 67°F. Land is valued around $3,727 an acre.

By site type

Top datacenter sites in Pointe Coupee Parish

Top datacenter sites in Pointe Coupee Parish
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN112426Substation-Adjacent230 kV300 MW4.3 yrs59.9
OZ Pointe CoupeeGreenfield——4.3 yrs58.6
OZ Pointe CoupeeGreenfield——4.3 yrs58.1
EC Near Big Cajun 2Greenfield——4.3 yrs56.3
EC Near Big Cajun 2Greenfield——4.3 yrs55.5
UNKNOWN114825Substation-Adjacent138 kV100 MW4.3 yrs55.5
EC Near Big Cajun 2Greenfield——4.3 yrs54.8
EC Near Big Cajun 2Greenfield——4.3 yrs54.4
UNKNOWN115860Substation-Adjacent138 kV100 MW4.3 yrs54.2
EC Near Big Cajun 2Greenfield——4.3 yrs53.9
EC Near Big Cajun 2Greenfield——4.3 yrs52.5
EC Near Big Cajun 2Greenfield——4.3 yrs50.2
Cottonseed MillIndustrial——4.3 yrs49.4
Wide Awake Gas StationIndustrial——4.3 yrs49.2
Greenfield (UNKNOWN114825 - UNKNOWN115689)Greenfield138 kV100 MW4.3 yrs48.8

Every scored site in Pointe Coupee Parish

All 15 sites, best first.

Pointe Coupee Parish datacenter FAQ

How many datacenter sites are in Pointe Coupee Parish?

15 scored datacenter candidate sites, averaging 54.1/100 DC Readiness. That is the 33rd-most of 59 Louisiana counties with five or more sites.

What is the highest-scoring datacenter site in Pointe Coupee Parish?

Substation-Adjacent site · 6e8f9a17 scores 59.9/100 DC Readiness, the highest of the 15 scored sites in Pointe Coupee Parish (a substation-adjacent site).

Does Pointe Coupee Parish offer datacenter tax incentives?

Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

What is the natural-hazard risk in Pointe Coupee Parish?

FEMA's National Risk Index rates Pointe Coupee Parish as "Very High" (score 58).

What are industrial electricity rates in Pointe Coupee Parish?

Average industrial electricity is 10.76¢/kWh and commercial is 13.54¢/kWh in Pointe Coupee Parish.

More in Louisiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Pointe Coupee Parish, Louisiana”, https://gridcensus.com/datacenter-sites/louisiana/pointe-coupee-parish (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Pointe Coupee Parish, Louisiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.