Datacenter Sites in Plaquemines, Louisiana

Plaquemines has 19 scored datacenter candidate sites averaging 47.2/100 DC Readiness, with a catalogued aggregate of 121 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

At a glance

Plaquemines, Louisiana has 19 scored datacenter candidate sites averaging 47.2/100 DC Readiness, about 11% below the Louisiana average of 53.1. It ranks 26th of 59 Louisiana counties by number of sites and 59th by average score. The top-scoring site is Substation-Adjacent site · 60117099 at 52.5/100.

19
Candidate sites
47.2/100
Avg DC Readiness
121 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 19 in Plaquemines

Site-selection context for Plaquemines

Yessales_tax_exemption
Datacenter tax incentive
10.09¢/kWh
Commercial electricity
5.63¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$2,130
Land price / acre
2,700
Cooling degree days
1,700
Heating degree days
67°F
Mean annual temp

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

How does Plaquemines compare with other counties in Louisiana?

By number of scored sites, Plaquemines ranks 26th of the 59 Louisiana counties with a county page, holding 1.1% of the state's 1,762 sites. Its average DC Readiness of 47.2/100 ranks 59th in the state and is about 11% below the national average of 53.2. Nationally it has the 1783rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 0 score 55 or higher.

What types of datacenter sites are in Plaquemines?

Greenfield sites are the most common (13, 68% of the county's inventory), followed by industrial (3) and substation-adjacent (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Plaquemines?

Industrial electricity averages 5.63¢/kWh and commercial 10.09¢/kWh. FEMA's National Risk Index rates the county "Very High" (58). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 2,700 cooling degree days a year with a mean temperature of 67°F. Land is valued around $2,130 an acre.

By site type

Top datacenter sites in Plaquemines

Top datacenter sites in Plaquemines
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN112666Substation-Adjacent115 kV100 MW4.3 yrs52.5
EC Near BurasGreenfield——4.3 yrs50.5
EC Near BurasGreenfield——4.3 yrs50.5
EC Near BurasGreenfield——4.3 yrs48.8
Jefferson Lake CanalIndustrial——4.3 yrs48.3
EC Near BurasGreenfield——4.3 yrs48.2
EC Near BurasGreenfield——4.3 yrs48.1
BurasBrownfield—21 MW4.3 yrs47.6
EC FFE Plaquemines ParishGreenfield——4.3 yrs47.4
EC Near BurasGreenfield——4.3 yrs47.0
EC Near BurasGreenfield——4.3 yrs46.8
172 Holiday DriveIndustrial——4.3 yrs46.5
EC Near BurasGreenfield——4.3 yrs46.5
Tesvich PropertyIndustrial——4.3 yrs46.4
Mine SiteFormer Mine——4.3 yrs45.1
EC Near BurasGreenfield——4.3 yrs44.7
EC Near BurasGreenfield——4.3 yrs44.3
EC Near BurasGreenfield——4.3 yrs43.8
EC Near BurasGreenfield——4.3 yrs43.4

Every scored site in Plaquemines

All 19 sites, best first.

Plaquemines datacenter FAQ

How many datacenter sites are in Plaquemines?

19 scored datacenter candidate sites, averaging 47.2/100 DC Readiness. That is the 26th-most of 59 Louisiana counties with five or more sites.

What is the highest-scoring datacenter site in Plaquemines?

Substation-Adjacent site · 60117099 scores 52.5/100 DC Readiness, the highest of the 19 scored sites in Plaquemines (a substation-adjacent site).

Does Plaquemines offer datacenter tax incentives?

Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

What is the natural-hazard risk in Plaquemines?

FEMA's National Risk Index rates Plaquemines as "Very High" (score 58).

What are industrial electricity rates in Plaquemines?

Average industrial electricity is 5.63¢/kWh and commercial is 10.09¢/kWh in Plaquemines.

More in Louisiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Plaquemines, Louisiana”, https://gridcensus.com/datacenter-sites/louisiana/plaquemines (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Plaquemines, Louisiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.