Skip to content
Gridcensus

Datacenter Sites in Caddo County, Louisiana

Caddo County has 111 scored datacenter candidate sites averaging 56.5/100 DC Readiness, with a catalogued aggregate of 4,650 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

At a glance

Caddo County, Louisiana has 111 scored datacenter candidate sites averaging 56.5/100 DC Readiness, roughly in line with the Louisiana average of 53.1. It ranks 3rd of 59 Louisiana counties by number of sites and 6th by average score. The top-scoring site is SOUTHWEST SHREVEPORT at 65.5/100.

111
Candidate sites
56.5/100
Avg DC Readiness
4,650 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Caddo County

Site-selection context for Caddo County

Yessales_tax_exemption
Datacenter tax incentive
10.50¢/kWh
Commercial electricity
8.11¢/kWh
Industrial electricity
11
Fiber providers
Low
Water stress
$4,525
Land price / acre
2,700
Cooling degree days
1,700
Heating degree days
67°F
Mean annual temp

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

How does Caddo County compare with other counties in Louisiana?

By number of scored sites, Caddo County ranks 3rd of the 59 Louisiana counties with a county page, holding 6.3% of the state's 1,762 sites. Its average DC Readiness of 56.5/100 ranks 6th in the state and is roughly in line with the national average of 53.2. Nationally it has the 286th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 85 score 55 or higher.

What types of datacenter sites are in Caddo County?

Industrial sites are the most common (55, 50% of the county's inventory), followed by substation-adjacent (34) and greenfield (19). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Caddo County?

Industrial electricity averages 8.11¢/kWh and commercial 10.50¢/kWh. FEMA's National Risk Index rates the county "Very High" (58). WRI water stress is low. 11 fiber providers report service in the county. The climate runs 2,700 cooling degree days a year with a mean temperature of 67°F. Land is valued around $4,525 an acre.

By site type

Top datacenter sites in Caddo County

Top datacenter sites in Caddo County
SiteTypeVoltageCapacityQueue waitScore
SOUTHWEST SHREVEPORTSubstation-Adjacent345 kV600 MW4.3 yrs65.5
LONGWOODSubstation-Adjacent345 kV600 MW4.3 yrs65.0
ARSENAL HILLSubstation-Adjacent138 kV100 MW4.3 yrs61.4
EDWARDS STREETSubstation-Adjacent138 kV100 MW4.3 yrs61.4
FORT HUMBUGSubstation-Adjacent138 kV100 MW4.3 yrs61.3
MC WILLIESubstation-Adjacent138 kV100 MW4.3 yrs61.2
EC Near LiebermanGreenfield——4.3 yrs60.5
LINWOODSubstation-Adjacent138 kV100 MW4.3 yrs60.3
PIERREMONTSubstation-Adjacent138 kV100 MW4.3 yrs60.0
TAP141992Substation-Adjacent138 kV100 MW4.3 yrs60.0
UNKNOWN309150Substation-Adjacent138 kV100 MW3.5 yrs60.0
SOUTH SHREVEPORTSubstation-Adjacent138 kV100 MW4.3 yrs60.0
HARTS ISLANDSubstation-Adjacent138 kV100 MW4.3 yrs59.9
WESTERN ELECTRICSubstation-Adjacent138 kV100 MW4.3 yrs59.7
GENERAL MOTORSSubstation-Adjacent138 kV100 MW4.3 yrs59.6
OZ CaddoGreenfield——4.3 yrs59.6
TAP141993Substation-Adjacent138 kV100 MW4.3 yrs59.6
TAP141989Substation-Adjacent138 kV100 MW4.3 yrs59.6
FLOURNOYSubstation-Adjacent138 kV100 MW4.3 yrs59.6
EC Coal Caddo ParishGreenfield——4.3 yrs59.5
TRICHEL STREETSubstation-Adjacent138 kV100 MW4.3 yrs59.1
OAK CO OPSubstation-Adjacent138 kV100 MW4.3 yrs59.1
EC Near LiebermanGreenfield——4.3 yrs58.9
WATERWORKSSubstation-Adjacent69 kV50 MW4.3 yrs58.8
EC Near LiebermanGreenfield——4.3 yrs58.7

Every scored site in Caddo County

All 111 sites, best first.

Caddo County datacenter FAQ

How many datacenter sites are in Caddo County?

111 scored datacenter candidate sites, averaging 56.5/100 DC Readiness. That is the 3rd-most of 59 Louisiana counties with five or more sites.

What is the highest-scoring datacenter site in Caddo County?

SOUTHWEST SHREVEPORT scores 65.5/100 DC Readiness, the highest of the 111 scored sites in Caddo County (a substation-adjacent site).

Does Caddo County offer datacenter tax incentives?

Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

What is the natural-hazard risk in Caddo County?

FEMA's National Risk Index rates Caddo County as "Very High" (score 58).

What are industrial electricity rates in Caddo County?

Average industrial electricity is 8.11¢/kWh and commercial is 10.50¢/kWh in Caddo County.

More in Louisiana

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Caddo County, Louisiana”, https://gridcensus.com/datacenter-sites/louisiana/caddo-county (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Caddo County, Louisiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.