LONGWOOD
Substation-AdjacentCaddo County, Louisiana · MISO
LONGWOOD is a substation-adjacent datacenter candidate site in Caddo County, Louisiana, interconnecting through MISO. It screens at 60.2/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Caddo County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SOUTHWEST SHREVEPORT | Substation-Adjacent | 345 kV | 600 MW | 2.8 yrs | 61.3 |
| EC Near Lieberman | Greenfield | — | — | 1.4 yrs | 59.3 |
| OZ Caddo | Greenfield | — | — | 1.4 yrs | 58.5 |
| EC Coal Caddo Parish | Greenfield | — | — | 1.4 yrs | 58.4 |
| EDWARDS STREET | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 58.1 |
| ARSENAL HILL | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 58.1 |
| FORT HUMBUG | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 57.9 |
| MC WILLIE | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 57.8 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for LONGWOOD, Caddo County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.