R S Nelson

Brownfield

Westlake, Calcasieu, Louisiana · Entergy Louisiana LLC

Legacy capacity
163
MW

R S Nelson is a natural gas plant in Westlake, Calcasieu, Louisiana, retired 2017-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 163 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity163 MW
Retirement date2017-01-01
EIA plant ID#1393

Grid hookup & remediation

Nearest substation0.2 mi
OperatorEntergy Louisiana LLC
Operator address3500 Houston River Road, Westlake, LA, 70669
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near R S Nelson, ranked by DC Readiness.

Candidate sites near R S Nelson
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN173167Substation-AdjacentLACalcasieu Parish500 kV1,000 MW1.4 yrs72.6
UNKNOWN173166Substation-AdjacentLACalcasieu Parish500 kV1,000 MW1.4 yrs71.3
CALCASIEUSubstation-AdjacentLACalcasieu Parish230 kV300 MW1.4 yrs67.0
UNKNOWN116398Substation-AdjacentLACalcasieu Parish230 kV300 MW1.4 yrs66.4
MOSS BLUFFSubstation-AdjacentLACalcasieu Parish230 kV300 MW1.4 yrs66.3
Greenfield (NELSON - RICHARD)GreenfieldLAJefferson Davis Parish500 kV1,000 MW1.4 yrs65.4
UNKNOWN116325Substation-AdjacentLACalcasieu Parish230 kV300 MW1.4 yrs64.7
UNKNOWN116395Substation-AdjacentLACalcasieu Parish138 kV100 MW1.4 yrs64.2

See all datacenter sites in Louisiana

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.