Datacenter Sites in Rock, Wisconsin

Rock has 100 scored datacenter candidate sites averaging 56.2/100 DC Readiness, with a catalogued aggregate of 4,450 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.

100
Candidate sites
56.2/100
Avg DC Readiness
4,450 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Rock

Site-selection context for Rock

Yessales_tax_exemption
Datacenter tax incentive
11.93¢/kWh
Commercial electricity
7.76¢/kWh
Industrial electricity
16
Fiber providers
Low
Water stress
$8,459
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

By site type

Top datacenter sites in Rock

Top datacenter sites in Rock
SiteTypeVoltageCapacityQueue waitScore
KITTYHAWKSubstation-Adjacent345 kV600 MW2.8 yrs63.9
PADDOCKSubstation-Adjacent345 kV600 MW2.8 yrs63.7
EC Near SheepskinGreenfield——1.4 yrs63.5
EC Near SheepskinGreenfield——1.4 yrs62.8
EC Near BlackhawkGreenfield——1.4 yrs62.0
EC Near SheepskinGreenfield——1.4 yrs61.3
ROCK RIVERSubstation-Adjacent138 kV100 MW2.8 yrs61.0
EC Near SheepskinGreenfield——1.4 yrs60.6
EC Near Rock RiverGreenfield——1.4 yrs60.6
EC Near SheepskinGreenfield——1.4 yrs60.4
EC Near SheepskinGreenfield——1.4 yrs60.3
EC Near SheepskinGreenfield——1.4 yrs60.3
EC Near Rock RiverGreenfield——1.4 yrs60.1
EC Near Rock RiverGreenfield——1.4 yrs59.7
EC Near Rock RiverGreenfield——1.4 yrs59.6
EC Near SheepskinGreenfield——1.4 yrs59.4
OZ RockGreenfield——1.4 yrs59.3
EC Near SheepskinGreenfield——1.4 yrs59.0
BLACKHAWK SW YDSubstation-Adjacent138 kV100 MW2.8 yrs59.0
WILCOXSubstation-Adjacent138 kV100 MW2.8 yrs58.9
EC Near BlackhawkGreenfield——1.4 yrs58.8
REC BRADFORDSubstation-Adjacent138 kV100 MW2.8 yrs58.7
UNKNOWN136972Substation-Adjacent138 kV100 MW2.8 yrs58.6
RUSSELLSubstation-Adjacent138 kV100 MW2.8 yrs58.6
BASS CREEKSubstation-Adjacent138 kV100 MW2.8 yrs58.5

Rock datacenter FAQ

How many datacenter sites are in Rock?
100 scored datacenter candidate sites, averaging 56.2/100 DC Readiness.
Does Rock offer datacenter tax incentives?
Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
What is the natural-hazard risk in Rock?
FEMA's National Risk Index rates Rock as "Relatively Low" (score 22).
What are industrial electricity rates in Rock?
Average industrial electricity is 7.76¢/kWh and commercial is 11.93¢/kWh in Rock.

Dataset updated . Screening estimates derived from public data sources.