Datacenter Sites in Rock, Wisconsin
Rock has 100 scored datacenter candidate sites averaging 56.2/100 DC Readiness, with a catalogued aggregate of 4,450 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.
100
Candidate sites
56.2/100
Avg DC Readiness
4,450 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
Site-selection context for Rock
Yessales_tax_exemption
Datacenter tax incentive
11.93¢/kWh
Commercial electricity
7.76¢/kWh
Industrial electricity
16
Fiber providers
Low
Water stress
$8,459
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
By site type
Top datacenter sites in Rock
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| KITTYHAWK | Substation-Adjacent | 345 kV | 600 MW | 2.8 yrs | 63.9 |
| PADDOCK | Substation-Adjacent | 345 kV | 600 MW | 2.8 yrs | 63.7 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 63.5 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 62.8 |
| EC Near Blackhawk | Greenfield | — | — | 1.4 yrs | 62.0 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 61.3 |
| ROCK RIVER | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 61.0 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 60.6 |
| EC Near Rock River | Greenfield | — | — | 1.4 yrs | 60.6 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 60.4 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 60.3 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 60.3 |
| EC Near Rock River | Greenfield | — | — | 1.4 yrs | 60.1 |
| EC Near Rock River | Greenfield | — | — | 1.4 yrs | 59.7 |
| EC Near Rock River | Greenfield | — | — | 1.4 yrs | 59.6 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 59.4 |
| OZ Rock | Greenfield | — | — | 1.4 yrs | 59.3 |
| EC Near Sheepskin | Greenfield | — | — | 1.4 yrs | 59.0 |
| BLACKHAWK SW YD | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 59.0 |
| WILCOX | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 58.9 |
| EC Near Blackhawk | Greenfield | — | — | 1.4 yrs | 58.8 |
| REC BRADFORD | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 58.7 |
| UNKNOWN136972 | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 58.6 |
| RUSSELL | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 58.6 |
| BASS CREEK | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 58.5 |
Rock datacenter FAQ
- How many datacenter sites are in Rock?
- 100 scored datacenter candidate sites, averaging 56.2/100 DC Readiness.
- Does Rock offer datacenter tax incentives?
- Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
- What is the natural-hazard risk in Rock?
- FEMA's National Risk Index rates Rock as "Relatively Low" (score 22).
- What are industrial electricity rates in Rock?
- Average industrial electricity is 7.76¢/kWh and commercial is 11.93¢/kWh in Rock.
Dataset updated . Screening estimates derived from public data sources.