Skip to content
Gridcensus

Rock, Wisconsin · MISO

DC Readiness
57.8
Good / 100

DANA CORP is a substation-adjacent datacenter candidate site in Rock, Wisconsin, interconnecting through MISO. It screens at 57.8/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationDANA CORP
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityWISCONSIN POWER & LIGHT COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth133
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEdgeConneX Madison (EDCMAD01)
IXP distance17.7 mi
Fiber providers16
Fiber coverage51.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterEdgeConneX Madison (EDCMAD01)
DC distance17.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.93¢/kWh
Industrial electricity7.76¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$8,459

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track DANA CORP

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
48
Fiber connectivity12%
76
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Rock, ranked by DC Readiness.

Sites near DANA CORP
SiteTypeVoltageCapacityQueue waitScore
KITTYHAWKSubstation-Adjacent345 kV600 MW4.3 yrs64.6
PADDOCKSubstation-Adjacent345 kV600 MW4.3 yrs64.4
EC Near SheepskinGreenfield——4.3 yrs62.9
EC Near SheepskinGreenfield——4.3 yrs62.2
ROCK RIVERSubstation-Adjacent138 kV100 MW4.3 yrs61.4
EC Near SheepskinGreenfield——4.3 yrs60.7
EC Near SheepskinGreenfield——4.3 yrs60.0
EC Near Rock RiverGreenfield——4.3 yrs60.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for DANA CORP, Rock is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.