Skip to content
Gridcensus

Greenfield (TAP137906 - SUNRISE)

Greenfield

Rock, Wisconsin · MISO

DC Readiness
53.1
Fair / 100

At a glance

Greenfield (TAP137906 - SUNRISE) is a greenfield datacenter candidate site in Rock, Wisconsin, scoring 53.1/100 DC Readiness — 76th of 100 scored sites in the county. Its nearest substation is TAP137906. It sits in the MISO grid region and the ROCK ENERGY COOPERATIVE service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationTAP137906
Substation voltage138 kV
Available capacity100 MW
UtilityROCK ENERGY COOPERATIVEcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth133
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEdgeConneX Madison (EDCMAD01)
IXP distance30.8 mi
Fiber providers16
Fiber coverage51.4%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterCentral Office
DC distance10.0 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.93¢/kWh
Industrial electricity7.76¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$8,459

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (TAP137906 - SUNRISE)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (TAP137906 - SUNRISE) compare with other sites in Rock?

Greenfield (TAP137906 - SUNRISE) ranks 76th of 100 scored candidate sites in Rock. Its 53.1/100 is roughly in line with the county average of 56.5. It is roughly in line with the Wisconsin average of 55.4 and roughly in line with the national average of 53.2.

Against the Wisconsin average, its strongest sub-score is natural hazard (78 vs 77) and its weakest is power availability (30 vs 38). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (TAP137906 - SUNRISE) to power, fiber and other datacenters?

The nearest mapped substation, TAP137906, is the closest grid connection point on record and operates at 138 kV. The nearest located transmission bottleneck is BASE_SUNRISE_4434_44 (MISO), 6 miles away. For connectivity, the nearest internet exchange facility is EdgeConneX Madison (EDCMAD01) at 30.8 miles. 16 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Central Office, 10 miles away.

What are the flood, water and hazard risks at Greenfield (TAP137906 - SUNRISE)?

At the county level, FEMA's National Risk Index rates Rock "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Rock, ranked by DC Readiness.

Sites near Greenfield (TAP137906 - SUNRISE)
SiteTypeVoltageCapacityQueue waitScore
KITTYHAWKSubstation-Adjacent345 kV600 MW4.3 yrs64.6
PADDOCKSubstation-Adjacent345 kV600 MW4.3 yrs64.4
EC Near SheepskinGreenfield——4.3 yrs62.9
EC Near SheepskinGreenfield——4.3 yrs62.2
ROCK RIVERSubstation-Adjacent138 kV100 MW4.3 yrs61.4
EC Near SheepskinGreenfield——4.3 yrs60.7
EC Near SheepskinGreenfield——4.3 yrs60.0
EC Near Rock RiverGreenfield——4.3 yrs60.0

Greenfield (TAP137906 - SUNRISE): common questions

What is the DC Readiness score of Greenfield (TAP137906 - SUNRISE)?

Greenfield (TAP137906 - SUNRISE) scores 53.1/100 on the GridCensus DC Readiness scale, rated fair. It ranks 76th of 100 scored sites in Rock. The Rock average is 56.5 and the Wisconsin average is 55.4.

What is the nearest substation to Greenfield (TAP137906 - SUNRISE)?

The nearest mapped substation is TAP137906, at 138 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves Greenfield (TAP137906 - SUNRISE)?

ROCK ENERGY COOPERATIVE (cooperative) holds the retail service territory that contains the site.

What grid region is Greenfield (TAP137906 - SUNRISE) in?

Greenfield (TAP137906 - SUNRISE) is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Greenfield (TAP137906 - SUNRISE) from an internet exchange?

The nearest internet exchange facility is EdgeConneX Madison (EDCMAD01), about 30.8 miles away; 16 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (TAP137906 - SUNRISE), Rock, WI”, https://gridcensus.com/datacenter-sites/wisconsin/rock/greenfield-tap137906-sunrise-4f1e16eb (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (TAP137906 - SUNRISE), Rock is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.