Datacenter Sites in Price, Wisconsin
Price has 22 scored datacenter candidate sites averaging 53.3/100 DC Readiness, with a catalogued aggregate of 666 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.
At a glance
Price, Wisconsin has 22 scored datacenter candidate sites averaging 53.3/100 DC Readiness, roughly in line with the Wisconsin average of 55.4. It ranks 54th of 72 Wisconsin counties by number of sites and 57th by average score. The top-scoring site is Substation-Adjacent site · 5cc3bdf3 at 56.8/100.
Site-selection context for Price
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
How does Price compare with other counties in Wisconsin?
By number of scored sites, Price ranks 54th of the 72 Wisconsin counties with a county page, holding 0.7% of the state's 3,340 sites. Its average DC Readiness of 53.3/100 ranks 57th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1603rd-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 10 score 55 or higher.
What types of datacenter sites are in Price?
Greenfield sites are the most common (13, 59% of the county's inventory), followed by substation-adjacent (6) and industrial (1). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.
What are power cost, hazard, water and fiber conditions in Price?
Industrial electricity averages 8.45¢/kWh and commercial 12.14¢/kWh. FEMA's National Risk Index rates the county "Relatively Low" (22). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 600 cooling degree days a year with a mean temperature of 44°F. Land is valued around $3,063 an acre.
By site type
Top datacenter sites in Price
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN132505 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 56.8 |
| UNKNOWN107656 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 56.8 |
| UNKNOWN132503 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 56.7 |
| UNKNOWN132504 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 56.6 |
| TAP139527 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 56.5 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 56.0 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 55.6 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 55.4 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 55.2 |
| UNKNOWN163457 | Substation-Adjacent | 69 kV | 50 MW | 4.3 yrs | 55.2 |
| OZ Price | Greenfield | — | — | 4.3 yrs | 54.3 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 53.6 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 52.8 |
| Northern States Flambeau | Brownfield | — | 16 MW | 4.3 yrs | 52.3 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 52.1 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 51.0 |
| Saunders Wood Specialties | Industrial | — | — | 4.3 yrs | 50.9 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 50.7 |
| Greenfield (UNKNOWN107656 - UNKNOWN132503) | Greenfield | 115 kV | 100 MW | 4.3 yrs | 50.0 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 50.0 |
| EC Near Northern States Flambeau | Greenfield | — | — | 4.3 yrs | 47.9 |
| Mine Site | Former Mine | — | — | 4.3 yrs | 46.3 |
Every scored site in Price
All 22 sites, best first.
- Substation-Adjacent site · 5cc3bdf3 · 56.8
- Substation-Adjacent site · 410f7af6 · 56.8
- Substation-Adjacent site · 5e61c22d · 56.7
- Substation-Adjacent site · 598f274f · 56.6
- Substation-Adjacent site · 61f4db50 · 56.5
- EC Near Northern States Flambeau · 1ee859ec · 56.0
- EC Near Northern States Flambeau · 0368c98c · 55.6
- EC Near Northern States Flambeau · 06a9e201 · 55.4
- EC Near Northern States Flambeau · 7b2d5bcb · 55.2
- Substation-Adjacent site · e9c499cd · 55.2
- OZ Price · 54.3
- EC Near Northern States Flambeau · 51c39bbd · 53.6
- EC Near Northern States Flambeau · 4765ff7b · 52.8
- Northern States Flambeau · 52.3
- EC Near Northern States Flambeau · 27b1fba3 · 52.1
- EC Near Northern States Flambeau · 527650c6 · 51.0
- Saunders Wood Specialties · 50.9
- EC Near Northern States Flambeau · def00e87 · 50.7
- Greenfield (UNKNOWN107656 - UNKNOWN132503) · 50.0
- EC Near Northern States Flambeau · c8c1e39b · 50.0
- EC Near Northern States Flambeau · fb29c3cf · 47.9
- Mine Site · d58fefd7 · 46.3
Price datacenter FAQ
How many datacenter sites are in Price?
22 scored datacenter candidate sites, averaging 53.3/100 DC Readiness. That is the 54th-most of 72 Wisconsin counties with five or more sites.
What is the highest-scoring datacenter site in Price?
Substation-Adjacent site · 5cc3bdf3 scores 56.8/100 DC Readiness, the highest of the 22 scored sites in Price (a substation-adjacent site).
Does Price offer datacenter tax incentives?
Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
What is the natural-hazard risk in Price?
FEMA's National Risk Index rates Price as "Relatively Low" (score 22).
What are industrial electricity rates in Price?
Average industrial electricity is 8.45¢/kWh and commercial is 12.14¢/kWh in Price.
More in Wisconsin
- All datacenter sites in Wisconsin· 3,340 sites
- Operating datacenters in Wisconsin
- Electric substations in Wisconsin
- Milwaukee· 304 sites · avg 57.4
- Dane County· 184 sites · avg 58.8
- Brown County· 144 sites · avg 57.4
- Winnebago County· 140 sites · avg 55.5
- Marathon County· 100 sites · avg 53.9
- Rock· 100 sites · avg 56.5
- Greenfield sites in Wisconsin
- Substation-Adjacent sites in Wisconsin
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Datacenter candidate sites in Price, Wisconsin”, https://gridcensus.com/datacenter-sites/wisconsin/price (data as of November 12, 2026).
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
Every site and score for Price, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.