UNKNOWN132505

Substation-Adjacent

Price, Wisconsin · MISO

DC Readiness
56.1
Good / 100

UNKNOWN132505 is a substation-adjacent datacenter candidate site in Price, Wisconsin, interconnecting through MISO. It screens at 56.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN132505
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityPRICE ELECTRIC COOP INCnot available

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXP901 Commerce Dr
IXP distance92.2 mi
Fiber providers3
Fiber coverage54.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenter901 Commerce Dr
DC distance92.2 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.14¢/kWh
Industrial electricity8.45¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$3,063

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN132505

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
45
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Price, ranked by DC Readiness.

Sites near UNKNOWN132505
SiteTypeVoltageCapacityQueue waitScore
EC Near Northern States FlambeauGreenfield1.4 yrs56.6
EC Near Northern States FlambeauGreenfield1.4 yrs56.2
UNKNOWN107656Substation-Adjacent115 kV100 MW2.8 yrs56.1
EC Near Northern States FlambeauGreenfield1.4 yrs56.0
UNKNOWN132503Substation-Adjacent115 kV100 MW2.8 yrs56.0
UNKNOWN132504Substation-Adjacent115 kV100 MW2.8 yrs56.0
TAP139527Substation-Adjacent115 kV100 MW2.8 yrs55.9
EC Near Northern States FlambeauGreenfield1.4 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN132505, Price. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.