Stafford has 38 scored datacenter candidate sites averaging 54.4/100 DC Readiness, with a catalogued aggregate of 2,400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Stafford, Virginia has 38 scored datacenter candidate sites averaging 54.4/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 49th of 122 Virginia counties by number of sites and 34th by average score. The top-scoring site is Substation-Adjacent site · 513931b6 at 68.1/100.

38
Candidate sites
54.4/100
Avg DC Readiness
2,400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Stafford

Site-selection context for Stafford

Yessales_tax_exemption
Datacenter tax incentive
6.92¢/kWh
Commercial electricity
5.75¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$16,854
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Stafford compare with other counties in Virginia?

By number of scored sites, Stafford ranks 49th of the 122 Virginia counties with a county page, holding 0.6% of the state's 5,871 sites. Its average DC Readiness of 54.4/100 ranks 34th in the state and is roughly in line with the national average of 53.0. Nationally it has the 1017th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 10 score 55 or higher.

What types of datacenter sites are in Stafford?

Shovel-Ready sites are the most common (25, 66% of the county's inventory), followed by substation-adjacent (7) and greenfield (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Stafford?

Industrial electricity averages 5.75¢/kWh and commercial 6.92¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 5 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $16,854 an acre.

By site type

Top datacenter sites in Stafford

Top datacenter sites in Stafford
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN116661Substation-Adjacent230 kV300 MW5.1 yrs68.1
UNKNOWN116662Substation-Adjacent500 kV1,000 MW5.1 yrs68.0
UNKNOWN161758Substation-Adjacent230 kV300 MW5.1 yrs63.6
FULLER ROADSubstation-Adjacent230 kV300 MW5.1 yrs62.6
AQUIA HARBORSubstation-Adjacent230 kV300 MW5.1 yrs62.3
Marine Corps Combat Development CommandBrownfield115 kV0 MW5.1 yrs61.8
QUANTICOSubstation-Adjacent115 kV100 MW5.1 yrs58.4
EC Coal Stafford CountyGreenfield——5.1 yrs57.8
UNKNOWN116497Substation-Adjacent115 kV100 MW5.1 yrs57.5
EC Coal Stafford CountyGreenfield——5.1 yrs55.9
EC Coal Stafford CountyGreenfield——5.1 yrs53.7
Merritt Business Park at Quantico Corporate Center, Building 2Shovel-Ready——5.1 yrs53.2
525 Corporate DriveShovel-Ready——5.1 yrs53.1
Quantico Corporate Center - Building 1Shovel-Ready——5.1 yrs53.1
Capitol 95 LogisticsShovel-Ready——5.1 yrs52.1
Aquia Town Center - Aquia 1Shovel-Ready——5.1 yrs52.0
Stafford Commerce Park IIShovel-Ready——5.1 yrs52.0
65 Barrett Heights RdShovel-Ready——5.1 yrs52.0
Austin Ridge Logistics Building 2Shovel-Ready——5.1 yrs51.8
Old Potomac Church - South CampusShovel-Ready——5.1 yrs51.8
Merritt at Austin Ridge - Building 5Shovel-Ready——5.1 yrs51.8
Merritt at Austin Ridge - Building 2Shovel-Ready——5.1 yrs51.8
Merritt at Austin Ridge - Building 1Shovel-Ready——5.1 yrs51.8
Merritt at Austin Ridge - Building 4Shovel-Ready——5.1 yrs51.8
Venture IndustrialShovel-Ready——5.1 yrs51.8

Every scored site in Stafford

All 38 sites, best first.

Stafford datacenter FAQ

How many datacenter sites are in Stafford?

38 scored datacenter candidate sites, averaging 54.4/100 DC Readiness. That is the 49th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Stafford?

Substation-Adjacent site · 513931b6 scores 68.1/100 DC Readiness, the highest of the 38 scored sites in Stafford (a substation-adjacent site).

Does Stafford offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Stafford?

FEMA's National Risk Index rates Stafford as "Relatively Moderate" (score 30).

What are industrial electricity rates in Stafford?

Average industrial electricity is 5.75¢/kWh and commercial is 6.92¢/kWh in Stafford.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Stafford, Virginia”, https://gridcensus.com/datacenter-sites/virginia/stafford (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Stafford, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.