Datacenter Sites in Powhatan, Virginia

Powhatan has 12 scored datacenter candidate sites averaging 52.6/100 DC Readiness, with a catalogued aggregate of 900 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

Powhatan, Virginia has 12 scored datacenter candidate sites averaging 52.6/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 98th of 122 Virginia counties by number of sites and 54th by average score. The top-scoring site is Substation-Adjacent site · 5b0f0137 at 60.3/100.

12
Candidate sites
52.6/100
Avg DC Readiness
900 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 12 in Powhatan

Site-selection context for Powhatan

Yessales_tax_exemption
Datacenter tax incentive
8.21¢/kWh
Commercial electricity
6.39¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$6,616
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does Powhatan compare with other counties in Virginia?

By number of scored sites, Powhatan ranks 98th of the 122 Virginia counties with a county page, holding 0.2% of the state's 5,871 sites. Its average DC Readiness of 52.6/100 ranks 54th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2244th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 3 score 55 or higher.

What types of datacenter sites are in Powhatan?

Shovel-Ready sites are the most common (9, 75% of the county's inventory), followed by substation-adjacent (3). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in Powhatan?

Industrial electricity averages 6.39¢/kWh and commercial 8.21¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 3 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $6,616 an acre.

By site type

Top datacenter sites in Powhatan

Top datacenter sites in Powhatan
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN116247Substation-Adjacent230 kV300 MW5.1 yrs60.3
TAP147903Substation-Adjacent230 kV300 MW5.1 yrs60.3
UNKNOWN116248Substation-Adjacent230 kV300 MW5.1 yrs59.9
Powhatan Technology ParkShovel-Ready——5.1 yrs50.9
Willis PropertyShovel-Ready——5.1 yrs50.5
Urbine PropertyShovel-Ready——5.1 yrs50.2
Powhatan GatewayShovel-Ready——5.1 yrs50.2
South Creek Industrial-Benchmark Office/WarehouseShovel-Ready——5.1 yrs50.1
Shady Oaks EDA PropertyShovel-Ready——5.1 yrs49.8
Pence-Briggs PropertyShovel-Ready——5.1 yrs49.7
South Creek- Lot 26Shovel-Ready——5.1 yrs49.7
Rocky Oak LLC PropertyShovel-Ready——5.1 yrs49.4

Every scored site in Powhatan

All 12 sites, best first.

Powhatan datacenter FAQ

How many datacenter sites are in Powhatan?

12 scored datacenter candidate sites, averaging 52.6/100 DC Readiness. That is the 98th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in Powhatan?

Substation-Adjacent site · 5b0f0137 scores 60.3/100 DC Readiness, the highest of the 12 scored sites in Powhatan (a substation-adjacent site).

Does Powhatan offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in Powhatan?

FEMA's National Risk Index rates Powhatan as "Relatively Moderate" (score 30).

What are industrial electricity rates in Powhatan?

Average industrial electricity is 6.39¢/kWh and commercial is 8.21¢/kWh in Powhatan.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 12, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in Powhatan, Virginia”, https://gridcensus.com/datacenter-sites/virginia/powhatan (data as of November 12, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for Powhatan, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.