Pence-Briggs Property

Shovel-Ready

Powhatan, Virginia · PJM

DC Readiness
49.3
Fair / 100

Pence-Briggs Property is a shovel-ready datacenter candidate site in Powhatan, Virginia, interconnecting through PJM. It screens at 49.3/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookConstrained
≈ 3.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXPEdgeConneX Richmond (EDCRIC01)
IXP distance21.2 mi
Fiber providers3
Fiber coverage23.5%

Site characteristics

Site typeShovel-Ready
Acreage31 ac
Buildable load (est.)~13–31 MWland-based

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterEdgeConneX Richmond (EDCRIC01)
DC distance21.2 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.21¢/kWh
Industrial electricity6.39¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$6,616

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Pence-Briggs Property

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
41
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Powhatan, ranked by DC Readiness.

Sites near Pence-Briggs Property
SiteTypeVoltageCapacityQueue waitScore
TAP147903Substation-Adjacent230 kV300 MW3.8 yrs60.0
UNKNOWN116247Substation-Adjacent230 kV300 MW3.8 yrs59.9
UNKNOWN116248Substation-Adjacent230 kV300 MW3.8 yrs59.6
Powhatan Technology ParkShovel-Ready——3.8 yrs50.5
Willis PropertyShovel-Ready——3.8 yrs50.1
Powhatan GatewayShovel-Ready——3.8 yrs49.9
Urbine PropertyShovel-Ready——3.8 yrs49.8
South Creek Industrial-Benchmark Office/WarehouseShovel-Ready——3.8 yrs49.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.