Skip to content
Gridcensus

Datacenter Sites in New Kent, Virginia

New Kent has 14 scored datacenter candidate sites averaging 55.8/100 DC Readiness, with a catalogued aggregate of 1,200 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

At a glance

New Kent, Virginia has 14 scored datacenter candidate sites averaging 55.8/100 DC Readiness, roughly in line with the Virginia average of 52.2. It ranks 90th of 122 Virginia counties by number of sites and 17th by average score. The top-scoring site is LANEXA at 62.4/100.

14
Candidate sites
55.8/100
Avg DC Readiness
1,200 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 14 in New Kent

Site-selection context for New Kent

Yessales_tax_exemption
Datacenter tax incentive
5.47¢/kWh
Commercial electricity
4.60¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$5,501
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

How does New Kent compare with other counties in Virginia?

By number of scored sites, New Kent ranks 90th of the 122 Virginia counties with a county page, holding 0.2% of the state's 5,871 sites. Its average DC Readiness of 55.8/100 ranks 17th in the state and is roughly in line with the national average of 53.0. Nationally it has the 2089th-largest site inventory of 2,964 counties with five or more sites. 0 sites score 70 or higher and 4 score 55 or higher.

What types of datacenter sites are in New Kent?

Shovel-Ready sites are the most common (10, 71% of the county's inventory), followed by substation-adjacent (4). Site type reflects how the parcel was identified — next to a substation, on a former mine or brownfield, on industrial or federal excess land — and is scored on the same 14 factors either way.

What are power cost, hazard, water and fiber conditions in New Kent?

Industrial electricity averages 4.60¢/kWh and commercial 5.47¢/kWh. FEMA's National Risk Index rates the county "Relatively Moderate" (30). WRI water stress is low. 2 fiber providers report service in the county. The climate runs 1,300 cooling degree days a year with a mean temperature of 55°F. Land is valued around $5,501 an acre.

By site type

Top datacenter sites in New Kent

Top datacenter sites in New Kent
SiteTypeVoltageCapacityQueue waitScore
LANEXASubstation-Adjacent230 kV300 MW5.1 yrs62.4
WEST POINTSubstation-Adjacent230 kV300 MW5.1 yrs62.0
TAP147961Substation-Adjacent230 kV300 MW5.1 yrs62.0
TAP147960Substation-Adjacent230 kV300 MW5.1 yrs61.9
Forge Logistics CenterShovel-Ready——5.1 yrs54.3
New Kent City CenterShovel-Ready——5.1 yrs54.1
New Kent Logistics Center - Building AShovel-Ready——5.1 yrs53.7
New Kent Logistics Center - TransloadShovel-Ready——5.1 yrs53.6
New Kent Logistics Center - Building CShovel-Ready——5.1 yrs53.6
New Kent Logistics Center - Building BShovel-Ready——5.1 yrs53.6
Theatre Square LC TractShovel-Ready——5.1 yrs53.5
Kinney Tract 1Shovel-Ready——5.1 yrs52.1
Kinney Tract 2Shovel-Ready——5.1 yrs52.1
New Kent Technology CenterShovel-Ready——5.1 yrs52.1

Every scored site in New Kent

All 14 sites, best first.

New Kent datacenter FAQ

How many datacenter sites are in New Kent?

14 scored datacenter candidate sites, averaging 55.8/100 DC Readiness. That is the 90th-most of 122 Virginia counties with five or more sites.

What is the highest-scoring datacenter site in New Kent?

LANEXA scores 62.4/100 DC Readiness, the highest of the 14 scored sites in New Kent (a substation-adjacent site).

Does New Kent offer datacenter tax incentives?

Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

What is the natural-hazard risk in New Kent?

FEMA's National Risk Index rates New Kent as "Relatively Moderate" (score 30).

What are industrial electricity rates in New Kent?

Average industrial electricity is 4.60¢/kWh and commercial is 5.47¢/kWh in New Kent.

More in Virginia

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published November 13, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Datacenter candidate sites in New Kent, Virginia”, https://gridcensus.com/datacenter-sites/virginia/new-kent (data as of November 13, 2026).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

Every site and score for New Kent, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.