Theatre Square LC Tract is a shovel-ready datacenter candidate site in New Kent, Virginia, interconnecting through PJM. It screens at 53.2/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookConstrained
≈ 3.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXPQTS Richmond (RIC1)
IXP distance8.4 mi
Fiber providers2
Fiber coverage80.7%

Site characteristics

Site typeShovel-Ready
Acreage25 ac
Buildable load (est.)~1025 MWland-based
Land contactNew Kent County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterMeta Henrico Data Center
DC distance7.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity5.47¢/kWh
Industrial electricity4.60¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,501

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Theatre Square LC Tract

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
41
Fiber connectivity12%
87
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
38
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in New Kent, ranked by DC Readiness.

Sites near Theatre Square LC Tract
SiteTypeVoltageCapacityQueue waitScore
LANEXASubstation-Adjacent230 kV300 MW3.8 yrs62.1
TAP147961Substation-Adjacent230 kV300 MW3.8 yrs61.7
TAP147960Substation-Adjacent230 kV300 MW3.8 yrs61.6
WEST POINTSubstation-Adjacent230 kV300 MW3.8 yrs61.6
Forge Logistics CenterShovel-Ready3.8 yrs53.9
New Kent City CenterShovel-Ready3.8 yrs53.8
New Kent Logistics Center - TransloadShovel-Ready3.8 yrs53.3
New Kent Logistics Center - Building CShovel-Ready3.8 yrs53.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Theatre Square LC Tract, New Kent. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.